Martensitic stainless steel wire with excellent cold working performance and high wear resistance and preparation method thereof
A martensitic stainless steel, cold working technology, applied in the direction of improving process efficiency, can solve the problems of difficulty, complex production process and high cost, and achieve the effect of improving the purity of molten steel, improving cold working performance and improving wear resistance.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] The first choice is to adopt the smelting path of electric arc furnace-AOD-VOD-LF to smelt stainless steel molten steel. In the process of electric arc furnace smelting, AOD furnace smelting and VOD furnace smelting, argon blowing and stirring are used; the ultimate vacuum degree of VOD furnace is required to be ≤67Mpa, the actual control is 20Mpa, and the vacuum holding time is ≥15min, which is actually 16min; in the LF refining process, feeding Enter the Al line, keep the Al content of the tapped steel at 0.020wt% ~ 0.040wt%, the actual control is 0.030wt%, and control the oxygen content of the tapped steel during refining to ≤ 30ppm, the refining time is ≥ 40min, and the actual refining time is controlled at 50min. After the end, the soft blowing time of argon blowing is ≥10min, and the actual control is 15min; the composition test shows that the oxygen content [O] in the steel is ≤30ppm, and the actual value is 25ppm.
[0032] Continuous casting of the above-mention...
Embodiment 2
[0037] The first choice is to adopt the smelting path of electric arc furnace-AOD-VOD-LF to smelt stainless steel molten steel. In the process of electric arc furnace smelting, AOD furnace smelting and VOD furnace smelting, argon blowing is used for stirring; the ultimate vacuum degree of VOD furnace is required to be ≤67Mpa, and the actual control is 25Mpa, and the vacuum holding time is ≥15min, which is actually 17min; in the LF refining process, feed Enter the Al line, keep the Al content of the tapped steel at 0.020wt% ~ 0.040wt%, the actual control is 0.032wt%, and control the oxygen content of the tapped steel during refining to ≤ 30ppm, and the refining time is ≥ 40min. The actual refining time is controlled at 56min. After the end, the soft blowing time of argon blowing is ≥10min, and the actual control is 13min; the composition test shows that the oxygen content [O] in the steel is ≤30ppm, and the actual value is 22ppm.
[0038] Continuous casting of the above-mention...