Fiber glass reinforced polyamide composite material and preparation method thereof
A composite material and polyamide technology, which is applied in the field of glass fiber reinforced polyamide composite materials and its preparation, can solve the problems of reducing the welding strength of materials and reducing the welding area of polymers at the welding interface, and achieve low cost, excellent welding strength, and wide The effect of applying the foreground
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] Example 1 Put 66% by weight of PA6, 2% of N-ethyl-p-toluenesulfonamide, 0.5% of KO-311, 0.5% of TAF, and 1% of other additives into a mixing tank After fully mixing for 15 minutes, put the mixed material into a twin-screw extruder for melting and kneading, extrude, and granulate. 30% of the glass fiber is fed from the side and the screw diameter of the twin-screw extruder is 35mm, the ratio of screw length to diameter is set to 32, the extrusion temperature is 230°C for the first zone, 240°C for the second zone, 220°C for the third zone, 230°C for the fourth zone, 245°C for the head, and the residence time 1-2min, the pressure is 15MPa.
Embodiment 2
[0035] Example 2 Put 66% by weight of PA66, 2% of N-ethyl-p-toluenesulfonamide, 0.5% of KO-311, 0.5% of TAF, and 1% of other additives into a mixing tank After fully mixing for 20 minutes, put the mixed material into a twin-screw extruder for melting and kneading, extrude, and granulate. 30% of glass fibers are fed from the side. The screw diameter of the twin-screw extruder is 35mm, the ratio of screw length to diameter is set to 40, the extrusion temperature is 250°C for the first zone, 270°C for the second zone, 260°C for the third zone, 270°C for the fourth zone, 275°C for the head, and the residence time 1-2min, the pressure is 13MPa.
Embodiment 3
[0036] Embodiment 3 The PA6 of 33% by weight, the PA66 of 33%, the N-ethyl-p-toluenesulfonamide of 2%, the KO-311 of 0.5%, the TAF of 0.5%, other additives of 1%, Put it into the mixing tank for 20 minutes of thorough mixing, put the mixed material into the twin-screw extruder to melt and knead, extrude, granulate, add 30% glass fiber from the side feed, and twin-screw extrude The screw diameter of the machine is 35mm, the ratio of screw length to diameter is set to 36, and the extrusion temperature is 240°C for the first zone, 260°C for the second zone, 250°C for the third zone, 260°C for the fourth zone, and 260°C for the die head. 265°C, residence time 1-2min, pressure 16MPa.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com
