Electroplating wastewater treatment method
A treatment method, a technology for electroplating wastewater, applied in metallurgical wastewater treatment, water/sewage multi-stage treatment, water/sludge/sewage treatment, etc., can solve problems such as high operating costs, high investment, secondary pollution, etc., and achieve operational Low cost and reduced investment effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0011] Embodiment 1: A kind of treatment method of electroplating wastewater, at first by chemical method broken chromium and broken cyanide, then by adding alkali or lime heavy metal ion, then filter and process by quartz sand filter, activated carbon filter and heavy metal catcher successively, Finally, add acid to adjust ph to 6-9, and discharge after meeting the discharge standard; wherein, after adding alkali or lime precipitation to carry out a precipitation, after precipitating most of the heavy metal ions, the following steps are also included: (1) Add acid to adjust the pH value to 8.5; (2) Add sodium sulfide Na 2 S and ferrous sulfate Fe 2 SO 4 , where Na 2 S and Fe 2 SO 4 Dosing at a ratio of 1:4, reacting for 10 minutes; (3) adding flocculant to precipitate hydroxide to form larger alum flower precipitation, and the precipitated sludge enters the sludge collection tank, and the supernatant is further processed.
Embodiment 2
[0012] Embodiment 2: A kind of treatment method of electroplating waste water, at first by chemical method broken chromium and broken cyanide, add alkali or lime to precipitate heavy metal ion, then filter and process by quartz sand filter, active carbon filter and heavy metal catcher successively, finally Add acid to adjust the pH to 6-9, and discharge after meeting the discharge standard; among them, after adding alkali or lime for precipitation to precipitate most of the heavy metal ions, the following steps are also included: (1) Add acid to adjust the pH value to 8.2 ; (2) adding sodium sulfide Na 2 S and ferrous sulfate Fe 2 SO 4 , where Na 2 S and Fe 2 SO 4 Dosing at a ratio of 1:3.5, reacting for 12 minutes; (3) adding flocculant to precipitate hydroxide to form larger alum flower precipitation, and the precipitated sludge enters the sludge collection tank, and the supernatant is further processed.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More