Process for manufacturing large-sized molybdenum rods
A production process and molybdenum rod technology, which is applied in the field of large-scale molybdenum rod production process, can solve the problems of large grain size, complex process, and difficulties, and achieve stable material grain structure, simple preparation process, and improved high temperature resistance. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0012] Embodiment one: A manufacturing process of a large molybdenum rod, the length of the molybdenum rod is greater than 2 meters, and the manufacturing steps are as follows:
[0013] Step 1. Put the molybdenum powder with a particle size of 1.6-2.5μm and a purity of ≥99.98% into a rubber mold to prepare a solid powdery molybdenum billet, and then use a cold isostatic press to form it with a pressure of 300Mpa for 10 minutes Solid billet forming;
[0014] Step 2. Put the formed solid billet into an intermediate frequency sintering furnace, and put hydrogen into the furnace. The heating temperature is 1800°C, and the heating time is 27 hours. After that, the water circulation is used to cool down for 9 hours, and then it is naturally placed to cool to room temperature. , the formed bar blank is ready for use;
[0015] Step 3. Heat the formed billet processed in step 2 to 1500°C for 1 hour. After taking it out, hit it 15 times with a 700 kg air hammer, then stretch it to the...
Embodiment 2
[0017] Embodiment two: A manufacturing process of a large molybdenum rod, the length of the molybdenum rod is greater than 2 meters, and the manufacturing steps are as follows:
[0018] Step 1. Put molybdenum powder with a particle size of 1.6-2.5μm and a purity of ≥99.98% into a rubber mold to prepare a solid powdery molybdenum billet, and then use a cold isostatic press to form it at a pressure of 350Mpa for 12 minutes Solid billet forming;
[0019] Step 2. Put the formed solid billet into an intermediate frequency sintering furnace, and put hydrogen into the furnace. The heating temperature is 1825°C, and the heating time is 27 hours. After that, the water circulation is used to cool down for 9.5 hours, and then it is cooled to room temperature and formed. Bar blank spare;
[0020] Step 3. Heat the formed billet processed in step 2 to 1550°C for 1.5 hours. After taking it out, hit it 20 times with a 700 kg air hammer, stretch it to the required size, and put the molybden...
Embodiment 3
[0022] Embodiment three: A manufacturing process of a large molybdenum rod, the length of the molybdenum rod is greater than 2 meters, and the manufacturing steps are as follows:
[0023] Step 1. Put molybdenum powder with a particle size of 1.6-2.5 μm and a purity of ≥99.98% into a rubber mold to prepare a solid powdery molybdenum billet, and then use a cold isostatic press to form it with a pressure of 350Mpa for 15 minutes Solid billet forming;
[0024] Step 2. Put the formed solid billet into an intermediate frequency sintering furnace, and put hydrogen into the furnace. The heating temperature is 1850°C, and the heating time is 27 hours. After that, the water circulation is used to cool down for 10 hours, and then cooled to room temperature. Forming Bar blank spare;
[0025] Step 3. Heat the formed billet processed in step 2 to 1600°C for 2 hours. After taking it out, hit it 25 times with a 700 kg air hammer, then stretch it to the required size, and finally put the mo...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More