Plugging agent system for permanently plugging multilayer low-pressure large-tunnel oil reservoir and technology using the same
A process technology, permanent technology, applied in the direction of sealing/isolation, drilling composition, wellbore/well components, etc., it can solve the problems of multiple intervals, high construction cost, and failure to meet the needs of oilfield development, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0085] Example 1: Shuang406 well plugging
[0086] 1. Basic situation: The well requires plugging of the 1615.0-1687.0m well section (8 intervals), with a span of 72m and a water absorption of 0.8m under 5MPa pump pressure 3 / min, the formation pressure is 10.73MPa, the total pressure drop is 5.26MPa, and the pressure maintenance level is 67.0%. The physical properties are detailed in Table 1 below.
[0087] Table 1 Physical properties of the plugging target formation in Well Shuang406
[0088]
[0089] 2. Implementation status:
[0090] 1. See the following table 2 for the formula of pre-blocking agent:
[0091] Table 2 Pre-blocking slug formula and dosage schedule
[0092]
[0093] 2. The amount of coagulant and isolated water:
[0094] Calcium chloride solution with a specific gravity of 1.3 30m 3 , isolated from clean water 5m 3 ;
[0095] 3. Dosage of plugging agent and replacement water:
[0096] Grade G medium-resistant oil well cement slurry with a specif...
Embodiment 2
[0108] Example 2: Plugging with new T4-2122
[0109] 1. Basic situation: The well requires plugging of the 942.2-959.6m well section (5 intervals), the formation pressure is 8.39MPa, and the water absorption is 460L / min under the pump pressure of 10MPa. The physical properties are shown in Table 3 below:
[0110] Physical property data of plugging target formation in Well Xin T4-2122 under Table 3
[0111]
[0112] 2. Implementation status:
[0113] 1. See the following table 4 for the formula of pre-blocking agent:
[0114] Table 4 Pre-blocking slug formula and dosage schedule
[0115]
[0116] 2. The amount of coagulant and isolated water:
[0117] Calcium chloride solution with a specific gravity of 1.3 30m 3 , isolated from clean water 5m 3 ;
[0118] 3. Dosage of plugging agent and replacement water:
[0119] YH-02 channeling and leakage plugging agent with a specific gravity of 1.55-1.6 30m 3 (blocking radius 2m), replace clean water 15.9m 3 , The formulat...
Embodiment 3
[0133] Example 3: Lower T3-212 plugging
[0134]1. Basic overview:
[0135] The well is due to H2Ⅰ3 3-4.5.6 There are large pores in the lower layer, which lead to steam channeling from the Lower T4-2114 Well which is 101m away from the southwest and the Lower T4-2116 Well which is 56m away from the northwest. In order to ensure the steam injection effect of the Lower T4-2114 and Lower T4-2116 wells, Request to block T3-212H2Ⅰ3 3-4.5.6 layer. In the preliminary extrusion test, the maximum pressure is 4.5MPa, and the water absorption is 520L / min. The physical properties are shown in Table 6 below:
[0136] Table 6 Physical properties of the plugging target layer in Well T3-212
[0137]
[0138] 2. Implementation status:
[0139] 1. The formula of pre-blocking agent is shown in the following table 7:
[0140] Table 7 Pre-blocking slug formula and dosage schedule
[0141]
[0142] 2. Coagulant and isolated water:
PUM
Property | Measurement | Unit |
---|---|---|
water absorption | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com