Preparation method of modified asphalt
A technology of modified asphalt and asphalt, which is applied in the field of preparation of modified asphalt, can solve problems such as poor compatibility, poor bonding strength, and actual service life limit, and achieve improved bonding performance, improved service life, and extended durability Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0018] The total content of active hydrogen (hydrogen in OH, SH and NH) in a certain solid pitch was determined to be 0.015% (WT, weight percent). Take 100 samples, heat to 90-170°C and melt, add 38% of 150# solvent oil, stir evenly, a small amount of toluene, such as 5%, and heat at 120-140°C and vacuum to remove water, then flush into dry nitrogen conditions Next, add 11% PAPI, control the temperature at 70-110°C to react for 3-5 hours, and measure the NCO% content in the modified asphalt until the required value. When the temperature drops below 50°C, it can be flushed into dry nitrogen packaging. This is isocyanate graft modified asphalt.
Embodiment 2
[0020] The total content of active hydrogen (hydrogen in OH, SH, and NH) in a certain solid asphalt was determined to be 0.015% (percentage by weight). Take 100 parts of the sample, heat to 90-170°C to melt, add 50 parts of xylene, stir evenly, after the heating cycle removes moisture, flush into dry nitrogen, then add 5.8% m-tolyl isocyanate, the temperature is controlled at 50-90°C, React for 4-12 hours, test the NCO% content, cool down to below 50°C, fill with protective gas and pack.
Embodiment 3
[0022] Determination of the total content of active hydrogen in a certain solid asphalt is 0.015% (percentage by weight), sample 100 parts, after melting at 90-170 ° C, add 30 parts of cyclohexane and 10 parts of toluene, stir evenly, pour into After drying the nitrogen, add 13.5 parts of H12MDI, under the condition of 110-130°C, add 0.3% dibutyltin dilaurate, control the temperature at 110-130°C, react for 3-9 hours, test the content of NCO, and cool down to 50 ℃, flushed into dry nitrogen packaging.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 