Method for removing barite blockage in oil and gas wells
A technology for barite and oil and gas wells, which is applied in chemical instruments and methods, earthwork drilling and production, wellbore/well components, etc. It can solve problems such as different technical solutions, different invention themes, and different technical effects, so as to increase production, Improve the seepage environment and increase the oil and gas production
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0028] A method for removing barite clogging in oil and gas wells, the steps are as follows:
[0029] (1) Configure the working solution: its composition and weight percentage concentration are: nitrogen triacetic acid (NTA) 1.0%, 4-pyridine 4-methylbenzenesulfonate 1.0%, 2-butanuonic acid sodium salt 0.5%, sodium chloride 1.0%, poly Dimethyl diallyl ammonium chloride (polydimethyl diallyl ammonium chloride) 1.0%, polyacrylamide 0.1%;
[0030] ⑵Open the well and release the blowout, obtain the original production capacity, and record the oil pressure observed before unblocking;
[0031] Note: Recording the oil pressure is convenient to compare with the production capacity after plugging removal to evaluate the plugging removal effect after the plugging removal construction is completed.
[0032] ⑶Under relatively high pressure, inject the working fluid with dispersed and dissolved barite in ⑴ from the oil pipe, and the flow rate is 2-4m 3 / min, add 200m 3 -300m 3 , shut do...
Embodiment 2
[0039] A method for removing barite clogging in oil and gas wells, the steps are as follows:
[0040] (1) Configure the working solution: its composition and weight percentage concentration are: nitrogen triacetic acid (NTA) 1.0%, 4-pyridine 4-methylbenzenesulfonate 1.0%, 2-butanuonic acid sodium salt 0.5%, sodium chloride 1.0%, poly Dimethyl diallyl ammonium chloride 1.0%, linear polyacrylamide 0.1%;
[0041] ⑵Open the well and release the blowout, obtain the original production capacity, and record the oil pressure observed before unblocking;
[0042] Note: Recording the oil pressure is convenient to compare with the production capacity after plugging removal to evaluate the plugging removal effect after the plugging removal construction is completed.
[0043] ⑶Under relatively high pressure, inject the working fluid with dispersed and dissolved barite in ⑴ from the oil pipe, and the flow rate is 2-4m 3 / min, add 200m 3 -300m 3 , shut down the well and soak for 4 hours, ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com