A multi-element alloy and cans technology, applied in the direction of improving process efficiency, can solve the problems of low element recovery rate, environmental pollution, waste of resources, etc., and achieve the effect of reducing production cost, improving recovery rate, and realizing comprehensive utilization.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] The cans, pebbles and wastes are processed, and the cans with a weight of 18.5g, the pebbles with a particle size of 20mm and other wastes are ground into powder, and the raw materials are sampled and tested to ensure that their element content reaches the standard; Reasonable proportioning, when the temperature of the submerged arc furnace reaches 2000°, keep the melting time for 5 minutes, and pour the alloy liquid into the ingot mold to cool after heat melting in the refining furnace; after cooling, it is crushed and sampled for inspection, and the product is analyzed The quality is secondary.
Embodiment 2
[0029] The cans, pebbles and wastes are processed, and the cans with a weight of 18.5g, the pebbles with a particle size of 50mm and other wastes are ground into powder, and the raw materials are sampled and tested to ensure that their element content reaches the standard; Reasonable proportioning, when the temperature of the submerged arc furnace reaches 2500°, keep the melting time for 20 minutes. After the heat is melted in the refining furnace, the alloy liquid is poured into the ingot mold to cool; after cooling, it is crushed and sampled. The quality is secondary.
Embodiment 3
[0031] The cans, pebbles and wastes are processed, and the cans with a weight of 18.5g, the pebbles with a particle size of 80mm and other wastes are ground into powder, and the raw materials are sampled and tested to ensure that their element content reaches the standard; Reasonable proportioning, when the temperature of the submerged arc furnace reaches 1800°, keep the melting time for 60 minutes, and pour the alloy liquid into the ingot mold to cool after the heat is melted in the refining furnace; The quality is third grade.