A technology of reclaiming asphalt and recycling asphalt, which is applied to building components, building insulation materials, buildings, etc., can solve the problems of low regeneration efficiency, high content of colloid and asphaltene, and reduced regeneration efficiency, and achieve good comprehensive performance and raw material sources Wide range of effects with high regeneration efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0036] Regenerated asphalt A, formula is by weight, as follows:
[0037] Recycled asphalt 100 parts
[0038] Extract oil 20 parts
[0039] 25 parts of catalytic oil slurry
[0040] 3 parts thermoplastic rubber
[0041] Extender 3 parts
[0042] 1 copy of PPA
[0043] Stabilizer 1 part
[0044] Anti-aging agent 1 part.
[0045] The preparation method of recycled asphalt is as follows:
[0046] (1) Heat the extracted oil and catalytic cracking oil slurry to 130°C until they are molten and flowing, add them to the reaction tank in proportion, stir and mix for 25 minutes,
[0047] (2) Raise the temperature of the recovered asphalt to 150°C to a molten state, add the mixture obtained in step (1), and stir and mix for 20 minutes;
[0048] (3) Add thermoplastic rubber and extension agent to the mixture obtained in step (2), stir and swell at 150°C for 60 minutes, add polyphosphoric acid and react for 40 minutes at 160°C under high-speed shear conditions, then drop to 145°C an...
Embodiment 2
[0050] According to the preparation method of Example 1, reclaimed asphalt B is prepared, and the distribution ratio of each component is as follows by weight:
[0051] Recycled asphalt 100 parts
[0052] Extract oil 25 parts
[0053] 20 parts of catalytic oil slurry
[0054] 4 parts thermoplastic rubber
[0055] Extender 2.5 parts
[0056] Cross-linking agent (PPA) 0.8 parts
[0057] Stabilizer 0.8 parts
[0058] 0.8 part of anti-aging agent;
[0059] The performance of recycled asphalt is shown in Table 2, which meets the technical requirements of JTG F40.
Embodiment 3
[0061] According to the preparation method of Example 1, reclaimed asphalt C is prepared, and the distribution ratio of each component is as follows by weight:
[0062] Recycled asphalt 100 parts
[0063] Extract oil 30 parts
[0064] 15 parts of catalytic oil slurry
[0065] Thermoplastic rubber 5 parts
[0066] Extender 2 parts
[0067] Cross-linking agent (PPA) 1.0 parts
[0068] Stabilizer 1.0 parts
[0069] 0.6 part of anti-aging agent.
[0070] The performance of recycled asphalt is shown in Table 2, which meets the technical requirements of JTG F40.