Silt solidification soil construction technology
A construction technology and soil solidification technology, which is applied in soil protection, infrastructure engineering, construction, etc., can solve the problems of occupying large cultivated land, polluting the environment, etc., and achieves the advantages of easy soil excavation, good solidification performance, and reduced excavation costs Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0022] Silt Solidification Project of Langqi Hongguang Lake Park
[0023] This project is located in Langqi Town, Fuzhou City, with a total solidified volume of 260,000 cubic meters. The construction areas for silt solidification are as follows:
[0024] (1) Solidification of lakeside slope; (2) Solidification of retaining wall and revetment;
[0025] (3) The solidification of the foundation of the filling area, including the solidification of the parking lot, paved square, and the foundation of the site;
[0026] (4) The roadbed of the park road is solidified.
[0027] Construction steps:
[0028] (1) Before construction, clean the surface of the site, remove debris on the surface of the site, and level the construction area;
[0029] (2) Sludge sampling, detection and analysis: Sampling of sludge, analysis of water content, particles and mineral composition of sludge, obtaining analysis data of sludge, and preparing sludge curing agent according to the obtained data; said sludge curing...
Embodiment 2
[0048] Soft foundation curing project of container stacking area in a port in Shenzhen
[0049] This project is located in a port in Shenzhen, and its port container area is backfilled with dredged silt. To be backfilled to the design elevation, use shallow foundation curing treatment. Its curing area is 200,000m 2 , Its solidified volume is 600,000 cubic meters. The object of solidification is highly compressible sludge. The technical indicators of silt are shown in the following table:
[0050]
[0051] Construction steps:
[0052] (1) Before construction, remove all the accumulated water in ponds and ditches, and excavate silt with an organic content of more than 6%;
[0053] (2) Sludge sampling, detection and analysis: Sampling of sludge, analysis of water content, particles and mineral composition of sludge, obtaining analysis data of sludge, and preparing sludge curing agent according to the obtained data; said sludge curing agent , In parts by weight, the raw material compo...
Embodiment 3
[0061] Dongdi Road (Haixu Road-Haiyue Road) Road Project in Tianjin Sino-Singapore Eco-city
[0062] The Dongdi Road of this project is located in Tianjin Sino-Singapore Eco-city, the original Tianjin Binhai Tourist Area. The planned functional positioning is mainly landscape and tourism, supplemented by transportation. The site along Dongdi Road is a land reclamation area for reclamation from the sea, and no vacuum reservation has been made. The maximum thickness of the landfill is 5m, and the filling period is 2 years. At the same time, there is about 6m of shallow marine sediment under the land. The above-mentioned soil layer has a large natural void ratio, a high natural water content, a large compressibility, and all are flow-plastic, and the foundation bearing capacity is low, which is a typical soft soil. Not only is it difficult for road construction machinery to enter the site, but also the settlement after construction is relatively large.
[0063] The technical indicato...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com