[0025] Step (1) plow the sandy soil, the plowing depth is 30cm, put the plowed soil aside first to form a pit; rake the bottom of the pit, and rake out the criss-cross extension rake ditch, the depth of the rake ditch is 4cm;
[0026] Step (2) Laying a layer of straw layer in the pit, the thickness of the straw layer is 3cm, spraying water on the straw layer until the straw layer is completely soaked; evenly sprinkle the microbial agent on the straw layer , the microbial agent includes one or more of Bacillus subtilis, lactic acid bacteria and yeast; the microbial agent includes Bacillus subtilis, lactic acid bacteria and yeast, and the mass ratio of Bacillus subtilis, lactic acid bacteria and yeast 2:2:5; in the process of laying a layer of straw layer in the pit, first fill in the straw section perpendicular to the width direction of the plow rake ditch in the plow rake ditch, and put the plow rake The rake ditch is filled, and then a layer of straw is laid on it;
[0027]...
Embodiment 2
[0031] Step (1) plow the sandy soil, the plowing depth is 40cm, put the plowed soil aside first to form a pit; rake the bottom of the pit, and rake out the criss-cross extension rake ditch, the depth of the rake ditch is 4cm;
[0032] Step (2) Laying a layer of straw layer in the pit, the thickness of the straw layer is 7cm, spraying water on the straw layer until the straw layer is completely soaked; evenly sprinkle the microbial agent on the straw layer , the microbial inoculant includes one or more of Bacillus subtilis, lactic acid bacteria and yeast; in the process of laying a layer of straw layer in the pit, first fill the rake ditch with the The straw section whose width direction is perpendicular to the rake ditch is filled with the rake ditch, and then the straw layer is laid on it;
[0033] Step (3) laying fermented layer on described microbial bacterial agent, the thickness of described fermented layer is 2cm, described fermented layer comprises bean dregs, distille...
Embodiment 3
[0037] Step (1) plow the sandy soil, the plowing depth is 33cm, put the plowed soil aside first to form a pit; rake the bottom of the pit, and rake out the criss-cross extension rake ditch, the depth of the rake ditch is 4cm;
[0038] Step (2) Laying a layer of straw layer in the pit, the thickness of the straw layer is 3cm, spraying water on the straw layer until the straw layer is completely soaked; evenly sprinkle the microbial agent on the straw layer , the microbial inoculant includes one or more of Bacillus subtilis, lactic acid bacteria and yeast; in the process of laying a layer of straw layer in the pit, first fill the rake ditch with the The straw section whose width direction is perpendicular to the rake ditch is filled with the rake ditch, and then the straw layer is laid on it;
[0039] Step (3) laying fermented layer on described microbial bacterial agent, the thickness of described fermented layer is 1cm, and described fermented layer comprises bean dregs, dist...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Thickness | aaaaa | aaaaa |
| Thickness | aaaaa | aaaaa |
| Thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 