Method for treating ammonium-salt-containing wastewater
A wastewater treatment and wastewater technology, applied in the field of ammonium-containing high-salt wastewater treatment and ammonium-containing wastewater treatment, can solve the problem of high cost of ammonium-containing high-salt wastewater treatment, reduce treatment costs, reduce environmental pollution, and achieve near-zero emissions Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0089] Such as figure 1 As shown, the waste water (containing NaCl 150g / L, Na 2 SO 4 56g / L, NH 4 Cl 27g / L, (NH 4 ) 2 SO 4 10.24g / L) with a feed rate of 120m 3 The speed of / h is passed into the vacuum degassing tank 4 for degassing (the vacuum degree of the gauge pressure gauge is-70kPa), and the waste water after the degassing is sent to the first heat exchange device 3 (titanium alloy plate heat exchanger) Introduce the sodium hydroxide aqueous solution that concentration is 45.16 mass % in the pipeline and carry out the pH value adjustment for the first time, and the adjusted pH value is monitored by the first pH value measuring device 61 (pH meter) (measured value is 8.0), will The waste water adjusted by the first pH value is sent to the first heat exchange device 31 through the first circulating pump 71, and performs a first heat exchange with the recovered first ammonia-containing steam condensate water to raise the temperature of the waste water to 63°C; then, i...
Embodiment 2
[0096] Carry out the treatment of waste water according to the method for embodiment 1, difference is, to containing NaCl 221g / L, NH 4 Cl 40g / L wastewater for treatment. The first evaporation conditions of the MVR evaporation device 2 include: the temperature is 90°C, the gauge pressure is -47.89kPa, and the evaporation capacity is 26m 3 / h. The second evaporation conditions of the multi-effect evaporator 1 include: the evaporation conditions of the first effect evaporator 1a include: a temperature of 140°C, a gauge pressure of 193.83kPa, and an evaporation capacity of 33.6m 3 / h; the evaporation conditions of the second effect evaporator 1b include: the temperature is 125°C, the gauge pressure is 130.69kPa, and the evaporation capacity is 33.6m3 / h; the evaporation conditions of the third effect evaporator 1c include: the temperature is 85°C, the gauge pressure is -57.65kPa, and the evaporation capacity is 33.8m 3 / h.
[0097] MVR evaporator 2 gets 77.05m per hour 3 Conta...
Embodiment 3
[0100] Carry out the treatment of waste water according to the method for embodiment 1, difference is, to containing Na 2 SO 4 130g / L, (NH 4 ) 2 SO 4 20g / L of wastewater for treatment. The first evaporation conditions of the MVR evaporation device 2 include: the temperature is 120°C, the gauge pressure is 56.97kPa, and the evaporation volume is 22.43m 3 / h. The second evaporation conditions of the multi-effect evaporator 1 include: the evaporation conditions of the first effect evaporator 1a include: the temperature is 155°C, the pressure in gauge pressure is 349.43kPa, and the evaporation capacity is 33.1m 3 / h; the evaporation conditions of the second effect evaporator 1b include: the temperature is 135°C, the gauge pressure is 211.6kPa, and the evaporation capacity is 33.1m 3 / h; the evaporation conditions of the third effect evaporator 1c include: the temperature is 100°C, the gauge pressure is -22.82kPa, and the evaporation capacity is 33.1m 3 / h.
[0101] MVR ev...
PUM
| Property | Measurement | Unit |
|---|---|---|
| particle diameter | aaaaa | aaaaa |
| particle diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 