A water eutrophication and resource utilization technology, applied in chemical instruments and methods, multi-stage water treatment, biological water/sewage treatment, etc., can solve the problems of resource utilization rate of secondary pollution, difficulty in popularization and application, complicated methods, etc. , to achieve the effect of low cost, strong operability and simple method
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
example 1
[0019] Example 1: Treatment of eutrophic water body in a lake in the north
[0020] Such as figure 1 and figure 2 As shown, the method is provided with a water treatment zone 4, a water treatment zone 5, a water treatment zone 6, a water treatment zone 7 and a matrix treatment zone 10, and the substrate treatment zone 10 is located at the water outlet 2 of the water treatment zone 7; Each water treatment area is provided with a water distribution ditch 3, and the water distribution ditch 3 is located at the front end of each water treatment area; a water receiving port 9 is set between the second water treatment area 5 and the third water treatment area 6, and the first water treatment area 4 and the second water treatment area Aqueducts 8 are set between areas 5 and between the third water treatment area 6 and the fourth water treatment area 7; cultivated soil 12 is arranged on the surface of each water treatment area, and plants 11 are planted on the cultivated soil 12; en...
example 2
[0027] Example 2: Treatment of eutrophic water body in a river in the north
[0028] Such as figure 1 and figure 2 As shown, the system is constructed, and the water flow per minute of the water inlet 1 is 15% of the capacity of the water distribution ditch 3. When the maximum depth of the water in the water treatment area 4 reaches 220mm, the water supply is stopped, and after 24 hours, the water passage 8 is opened. The water in the first water treatment area 4 enters the second water treatment area (5), and after an interval of 26 hours, the first water treatment area 4 continues to enter the water.
[0029] After maintaining the water in the second water treatment area 5 for 24 hours, open the water receiving port 9, and the water enters the third water treatment area 6, and after maintaining for 24 hours, open the water passage 8 between the third water treatment area 6 and the fourth water treatment area 7, and the water After entering the fourth water treatment area ...
PUM
| Property | Measurement | Unit |
|---|---|---|
| particle diameter | aaaaa | aaaaa |
| particle diameter | aaaaa | aaaaa |
| thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 