A preventive control method for power grid cps based on anticipated accident scenarios
A technology of anticipating accidents and preventing and controlling, applied in the direction of electrical components, circuit devices, AC network circuits, etc., can solve the requirements of prevention and control of power grids that do not meet the requirements of smart distribution networks, do not consider fraudulent data misoperations of power grids, and event alarm information Mixed together and other problems, to achieve the effect of making up for the low accuracy of measurement values, realizing defense, and reducing the number
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0117] The specific implementation manners of the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.
[0118] This embodiment provides a structural block diagram of a power grid CPS preventive control device based on an anticipated accident scenario, as shown in figure 1 shown. It consists of a target power grid, a data acquisition unit, an acquisition processing unit, a central control unit, and a host computer. The central control unit mainly includes an FPGA acquisition control unit, a data cache unit, and a DSP data processing unit.
[0119] The principle of FPGA acquisition control unit, data buffer unit and A / D conversion unit interface circuit is as follows: figure 2 As shown, the A / D conversion unit chooses the ADS7844 chip, and the FPGA acquisition control unit ...