A Construction Method for Vibration Absorption of Tunnel Exit with Very Small Clear Distance
A construction method and tunnel technology, applied in tunnels, tunnel linings, earthwork drilling and mining, etc., can solve problems such as tunnel lining damage in middle rock pillars, and achieve the effects of reducing damage, shortening the construction period, and reducing damage
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0047] An embodiment of a construction method for shock absorption of a bifurcated extremely small-distance tunnel exit. The construction method of the present invention is used to construct the old house foundation tunnel of Xingyi Ring Expressway in Guizhou Province. The tunnel has a total length of about 393m and is a bifurcated short tunnel. The distance between the tunnel lines at the exit section is 0.6m from the minimum contour line, and then gradually divided into very small net distance, small net distance, and separate tunnels, and the line distance at the entrance section is about 35m.
[0048] In the actual construction process, the construction method of the present invention has remarkable effect, effectively reduces the damage to the middle rock pillar and the lining of the leading hole by blasting of the backward hole, and has good economic benefits. see Figure 1 to Figure 7 , its construction process includes the following steps:
[0049] (1) Excavation of ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com