Sound-absorption and vibration-isolation concrete material vibration resisting ditch backfill construction method and application
A construction method and concrete technology, applied in the field of buildings, can solve problems such as lack of oxygen for workers, inconvenient operation, lack of vibration isolation, etc., and achieve the effect of simple and fast construction and simple construction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0026] A construction method for backfilling anti-vibration trenches of sound-absorbing and vibration-isolated concrete materials, comprising the following steps:
[0027] (1) Clean up the construction waste in the anti-vibration ditch and clean up the accumulated water. After cleaning, pour a 0.1m thick C15 concrete cushion at the bottom of the anti-vibration ditch, and then paste 3.9m high and 0.05m thick on both sides of the anti-vibration ditch Polystyrene-like board as a waterproof protective layer;
[0028] (2) In the anti-vibration ditch, lime-sand bricks are used to build the first layer of partition walls at equal intervals. The distance between two adjacent partition walls in each layer of partition walls is 30m, and each partition wall is 0.24m thick and 1m high , with a width of 0.6m, the sound-absorbing and vibration-isolation concrete material is poured between the partition walls of the first floor by pumping to the same height as the partition walls of the firs...
Embodiment 2
[0033] A construction method for backfilling anti-vibration trenches of sound-absorbing and vibration-isolated concrete materials, comprising the following steps:
[0034] (1) Clean up the construction waste in the anti-vibration ditch and clean up the accumulated water. After cleaning, pour a 0.1m thick C15 concrete cushion at the bottom of the anti-vibration ditch, and then paste 3.9m high and 0.05m thick on both sides of the anti-vibration ditch Polystyrene-like board as a waterproof protective layer;
[0035] (2) In the anti-vibration ditch, ordinary fly ash bricks are used to build the first layer of partition walls at equal intervals. The distance between two adjacent partition walls in each layer of partition walls is 35m, and the thickness of each partition wall is 0.24m. The height is 1.2m, the width is 0.8m, and the sound-absorbing and vibration-isolation concrete material is poured between the first-layer partition walls by pumping to the same height as the first-la...
Embodiment 3
[0040] A construction method for backfilling anti-vibration trenches of sound-absorbing and vibration-isolated concrete materials, comprising the following steps:
[0041] (1) Clean up the construction waste in the anti-vibration ditch and clean up the accumulated water. After cleaning, pour a 0.1m thick C15 concrete cushion at the bottom of the anti-vibration ditch, and then paste 3.9m high and 0.05m thick on both sides of the anti-vibration ditch Polystyrene-like board as a waterproof protective layer;
[0042] (2) In the anti-vibration ditch, lime-sand bricks are used to build the first layer of partition walls at equal intervals. The distance between two adjacent partition walls in each layer of partition walls is 40m, and each partition wall is 0.24m thick and 1.5m high. m, 1.2m wide, the sound-absorbing and vibration-isolation concrete material shall be poured between the partition walls of the first floor by pumping to the same height as the partition walls of the first...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com