A construction method for coal mine tbm continuous roadway digging and coal mine tbm

A construction method and technology for coal mines, which are applied in mining equipment, earth-moving drilling, tunnels, etc., can solve the problems of low work efficiency of rock roadway excavation, and achieve the effects of good roadway formation effect, high operation safety and high excavation efficiency.

Active Publication Date: 2022-02-08
CHINA RAILWAY ENGINEERING EQUIPMENT GROUP CO LTD
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] In view of the deficiencies in the above-mentioned background technology, the present invention proposes a construction method for coal mine TBM continuous tunneling and coal mine TBM, which solves the problem of low work efficiency of rock tunnel tunneling in the prior art

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A construction method for coal mine tbm continuous roadway digging and coal mine tbm
  • A construction method for coal mine tbm continuous roadway digging and coal mine tbm
  • A construction method for coal mine tbm continuous roadway digging and coal mine tbm

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0032] Embodiment 1: as Figure 6 As shown, a coal mine TBM includes an explosion-proof shield body 101 and a slag removal system 103, both of which adopt an explosion-proof design to meet the safety requirements of coal mine excavation. The cross-section of the explosion-proof shield 101 can be circular or rectangular as required. The front end of the explosion-proof shield body 101 is provided with an excavation device 102, and the design of the excavation device can adopt the existing cutter head design. The combined use of the excavation device can realize the steering of the excavation device, making the excavation more flexible and realizing continuous excavation. The slag discharge system 103 corresponds to the slag discharge port of the excavation device 102, and the slag discharge system 103 can use a central belt conveyor and a tail belt conveyor for smooth slag discharge during the excavation process.

[0033] Further, the explosion-proof shield body 101 includes ...

Embodiment 3

[0043] Embodiment 3, a construction method for continuous tunneling by TBM in a coal mine. In step S6, when N=1, the steps are as follows: B1: excavate two main transport roadways 6 longitudinally on both sides of the area to be excavated. The preset position of a main transport roadway 6 is used as a starting site 11 arranged laterally, and the preset position of another transport roadway 6 is used as a receiving site 12 arranged horizontally; The site is located at another level of the excavated rock lane;

[0044] B2: Hoist the coal mine TBM to the starting site 11, and then carry out continuous lateral excavation of the first rock roadway 1 along the preset route;

[0045] B3: When the coal mine TBM finishes excavating the first rock roadway, it just returns to the receiving station 12, and then lifts the coal mine TBM out of the roadway along the main transport roadway 6 to complete the entire excavation work.

[0046] In the step S6, N (N≥2) rock roadways are arranged i...

Embodiment 4

[0049] Embodiment 4: as Figure 3-5 As shown, taking the gas drainage roadway digging in the working face of the main mining coal seam of the coal mine as an example, the main mining coal seam 25 is a high-gas coal seam. 6 excavation. That is, gas drainage must be performed on the mining face before mining, and before the working face of the main mining seam is excavated along the trench 28, the coal mine TBM8 is used in the overlying strata 24 of the main coal mining seam 25, along the trench with the working face of the main coal mining seam. 28 into a certain angle and azimuth, and excavate the high-level gas drainage lane or measure lane 23, or adopt a coal mine TBM8 in the overburden layer 27 under the main coal mining seam 25, and form a certain angle and azimuth with the main coal mining seam working face along the groove 28, Excavate the low-level gas drainage roadway 26, and use the coal mine TBM8 to carry out the small turning radius, reciprocating, continuous and u...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a coal mine TBM continuous roadway excavation construction method and a coal mine TBM, which solves the problem of low work efficiency of rock roadway excavation in the prior art. The present invention is a construction method for coal mine TBM continuous roadway excavation, the steps are as follows: S1: Excavate the main transport roadway longitudinally on one side of the area to be excavated; Station and receiving station; S3: Hoist the coal mine TBM to the starting station, and then carry out continuous lateral excavation of the first rock roadway along the preset route. The present invention proposes a method for coal mine TBM to carry out small turning radius, reciprocating, continuous uninterrupted rock roadway excavation without dismantling the machine. The method makes the coal mine rock roadway excavation speed at least on the basis of the existing traditional roadway speed. Increased by more than five times, the roadway digging method has many advantages such as high degree of construction mechanization, high excavation work efficiency, good roadway forming effect, high operation safety, etc., and has high promotion value.

Description

technical field [0001] The invention relates to the technical field of coal mine excavation, in particular to a construction method for coal mine TBM continuous roadway excavation and a coal mine TBM. Background technique [0002] At present, there are mainly two methods of tunneling in coal mines, namely drilling and blasting and cantilever tunneling. These two methods of tunneling in rocks have their own limitations. [0003] Drilling and blasting method is used to excavate roadway, such as the method of rapid excavation and continuous support operation of coal mine roadway with application number 201310469323.0, which mainly adopts manual or mechanical rock drilling for drilling, charging and blasting, through belt conveyor system or scraper conveyor, rail The excavation method is to excavate slag in the form of mine car and trackless rubber-tyred vehicle, and carry out roadway maintenance accordingly. This method adopts the method of independent excavation of single lan...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21D9/06E21D9/08E21D9/14
CPCE21D9/06E21D9/08E21D9/0621E21D9/14
Inventor 陈虎忠王乐刘文学高建高雁邱胜进
Owner CHINA RAILWAY ENGINEERING EQUIPMENT GROUP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products