Low-temperature formed polymer modified asphalt and preparation method thereof
A technology for modifying asphalt and polymers, which can be used in building structures, building insulation materials, building components, etc. It can solve problems such as fuel consumption and pollutant emissions, and achieve low molding temperature, reduced energy consumption, and good compatibility Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] The low molding temperature polymer modified asphalt of the present invention and its preparation method, the preparation steps are as follows:
[0034] S1. Pretreatment: Mix 3 parts of styrene-glycidyl methacrylate copolymer with 3 parts of C9 petroleum resin at 100°C to obtain a pretreatment agent, raise the temperature to 160°C, and place 6 parts of SBS modifier in the pretreatment Fully stir and mix in the treatment agent, and simultaneously shear at a high speed, the shear speed is 3500r / min, and the shear time is 1h to obtain the SBS / styrene-glycidyl methacrylate copolymer / C9 petroleum resin mixture;
[0035] S2. Asphalt modification: Heat 52 parts of base asphalt to 160°C, take the above SBS / styrene-glycidyl methacrylate copolymer / C9 petroleum resin mixture, add 10 parts of plasticizer and 18 parts of filler, place in Mix evenly in the base asphalt, and at the same time highly shear, the shear speed is 7000r / min, the shear time is 1h, and then maintain the temper...
Embodiment 2
[0037] The low molding temperature polymer modified asphalt of the present invention and its preparation method, the preparation steps are as follows:
[0038] S1. Pretreatment: Fully mix 4 parts of styrene-glycidyl methacrylate copolymer with 4 parts of C9 petroleum resin at 95°C to obtain a pretreatment agent, raise the temperature to 150°C, and place 8 parts of SBS modifier in the pretreatment Fully stir and mix in the treatment agent, and simultaneously shear at a high speed, the shear speed is 4000r / min, and the shear time is 1h to obtain the SBS / styrene-glycidyl methacrylate copolymer / C9 petroleum resin mixture;
[0039]S2. Asphalt modification: Heat 55 parts of base asphalt to 150°C, take the above SBS / styrene-glycidyl methacrylate copolymer / C9 petroleum resin mixture, add 9 parts of plasticizer and 22 parts of filler, place in Mix evenly in the base asphalt, and at the same time, high shear, the shear speed is 6600r / min, the shear time is 1h, and then maintain the temp...
Embodiment 3
[0041] The low molding temperature polymer modified asphalt of the present invention and its preparation method, the preparation steps are as follows:
[0042] S1. Pretreatment: Mix 5 parts of styrene-glycidyl methacrylate copolymer with 5 parts of C9 petroleum resin at 100°C to obtain a pretreatment agent, raise the temperature to 140°C, and place 10 parts of SBS modifier in the pretreatment Fully stir and mix in the treatment agent, and simultaneously shear at a high speed, the shear speed is 3700r / min, and the shear time is 1h to obtain the SBS / styrene-glycidyl methacrylate copolymer / C9 petroleum resin mixture;
[0043] S2. Asphalt modification: Heat 50 parts of base asphalt to 140°C, take the above SBS / styrene-glycidyl methacrylate copolymer / C9 petroleum resin mixture, add 11 parts of plasticizer and 19 parts of filler, place in Mix evenly in the base asphalt, and at the same time, high shear, the shear speed is 8000r / min, the shear time is 1h, and then maintain the temper...