Gas turbine and coal machine combined power generation system and method
A combined power generation, gas-fired and coal-fired machine technology, applied in the direction of combined combustion mitigation, machines/engines, mechanical equipment, etc., can solve the problems of lower efficiency than coal-fired boilers, small capacity of waste heat boilers, low operating parameters, etc., and achieve high efficiency , reduced exhaust loss, and improved low-load operating capacity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0046] Please refer to the attached figure 1 It is a flow chart of a combined power generation method of a gas-fired coal-fired engine in a specific embodiment of the present invention, including the following steps:
[0047]Step 1: Determine whether the sum of the high-temperature flue gas pressure stored in the underground cave and the resistance of the flue gas pipeline is lower than the maximum allowable exhaust pressure corresponding to the gas turbine load. If it is satisfied, then perform step 2; if not, perform step 3;
[0048] Step 2: Send the high-temperature flue gas discharged from the gas turbine into the underground cave;
[0049] Step 3: Send the high-temperature flue gas discharged from the gas turbine to the waste heat boiler;
[0050] Step 4: Send the high-temperature flue gas from the underground cave into the mixed secondary air box of the coal-fired boiler, mix with the secondary air in the mixed secondary air box to replace part of the low-temperature se...
Embodiment 2
[0058] Please refer to the attached figure 2 It is a structural schematic diagram of a coal-fired turbine combined power generation system of the present invention. The system includes: a gas turbine 1 , a waste heat boiler 3 , a coal-fired boiler 4 , an underground cave 7 and a control system 22 .
[0059] The gas turbine 1 is connected to the waste heat boiler 3 through the main exhaust pipe 2 and the first exhaust pipe 5, and is connected to the underground cave 7 through the main exhaust pipe 2 and the second exhaust pipe 6. Isolation baffle 10, the entrance of underground cave 5 is provided with first fume isolation baffle 9. Underground cavern 7 is provided with exhaust blower 8.
[0060] The coal-fired boiler 4 is provided with a mixed secondary air box 12 and a mixed burnout air box 13 .
[0061] The underground cave 7 is connected to the mixing secondary air box 12 and the mixing burnout air box 13 through the flue gas pipeline 11, and the flue gas entrance of the...