A kind of high and low temperature toughness hydraulic cylinder head and cylinder tail steel and its production process
A hydraulic cylinder, high and low temperature technology, applied in high and low temperature ductile hydraulic cylinder cylinder head and tail steel and its manufacturing field, can solve the problems of high cost of nickel element, poor low temperature toughness, unable to use normally, etc., to achieve full deoxidation capacity, Improves strength and good low temperature impact toughness
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment approach 2
[0058] The chemical composition is shown in Table 5 and Table 6 below.
[0059] C Si mn V Al N V / N 0.10 0.36 1.75 0.060 0.030 0.0078 7.69
[0060] P S Cr Mo Ti Ni Nb As Cu B 0.009 0.003 0.03 0.0035 0.0025 0.02 0.0045 0.0040 0.03 0.0004
[0061] Prepared by the following production process:
[0062] 1) Hot metal pretreatment: hot metal is desulfurized by KR, the sulfur content of hot metal is 0.030%, the amount of desulfurizer added is 350Kg, the stirring speed is 80r / min, and the stirring time is 7 minutes.
[0063] 2) Converter smelting: smelting in a 90-ton top-bottom double-blowing converter, using 72 tons of molten iron and 20 tons of scrap steel as raw materials for primary smelting, tapping carbon 0.06%, phosphorus 0.008%, sulfur 0.002%, tapping temperature 1630 ℃, the double slag blocking method of sliding plate and slag blocking cone is adopted for tapping to prevent slag dropping, and 372kg of ...
specific Embodiment approach 3
[0075] The chemical composition is shown in Table 9 and Table 10 below.
[0076] C Si mn V Al N V / N 0.08 0.35 1.72 0.058 0.029 0.0080 7.25
[0077] P S Cr Mo Ti Ni Nb As Cu B 0.0010 0.005 0.02 0.0040 0.0022 0.02 0.0040 0.0035 0.04 0.0005
[0078] Prepared by the following production process:
[0079] 1) Hot metal pretreatment: The hot metal is desulfurized by KR, the sulfur content of the hot metal is 0.028%, the amount of desulfurizer added is 340Kg, the stirring speed is 80r / min, and the stirring time is 8 minutes.
[0080] 2) Converter smelting: smelting in a 90-ton top-bottom double-blowing converter, using 70 tons of molten iron and 20 tons of scrap steel as raw materials for primary smelting, tapping carbon 0.05%, phosphorus 0.009%, sulfur 0.003%, tapping temperature 1650 ℃, the double slag blocking method of sliding plate and slag blocking cone is adopted to prevent slag dropping, and 368kg of pr...
PUM
| Property | Measurement | Unit |
|---|---|---|
| tensile strength | aaaaa | aaaaa |
| yield strength | aaaaa | aaaaa |
| elongation | aaaaa | aaaaa |