A ferro-tungsten and concentrate technology, which is applied in the field of smelting ferro-tungsten, can solve the problems of excessive inert slag in the slag, production efficiency of ferro-tungsten that cannot be taken out of the furnace, and difficulties in the source of raw materials for ferro-tungsten smelting.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0047] The product that this embodiment produces is iron tungsten FeW80-A
[0048] 1. Production site
[0049] The factory site of this embodiment is located in Maqiao Township, Rucheng County, Hunan Province, and the factory covers an area of 8000m 2 .
[0050] 2. Production equipment
[0051]The main equipment includes: a tiltable three-phase open electric furnace, a transformer with a capacity of 3500kVA, the electrodes are self-baking electrodes, and the electrodes are fixed with pneumatic spring clamping grippers. The shell is welded by 20mm thick steel plate. The whole furnace is placed on two semicircular rollers, and the tilt of the furnace is controlled by the lifting of the hydraulic cylinder to release the depleted slag. There is a feeding bin above the exhaust hood of the furnace, and the scheelite concentrate charge is fed into the furnace by three screw feeders. There is a 1500mm×1500mm×500mm water pool on both sides of the furnace. The hot iron tungsten is...
Embodiment 2
[0065] 1. Production site
[0066] The factory site of this embodiment is located in Sanxing Township, Rucheng County, Hunan Province, and the factory covers an area of 5000m 2 .
[0067] 2. Production equipment
[0068] The main equipment includes: a tiltable three-phase open electric furnace, a transformer with a capacity of 3000kVA, the electrode is a self-baking electrode, and the electrode is fixed with a pneumatic spring clamping gripper. The shell is welded by 20mm thick steel plate. The whole furnace is placed on two semicircular rollers, and the tilt of the furnace is controlled by the lifting of the hydraulic cylinder to release the depleted slag. There is a feeding bin above the exhaust hood of the furnace, and the scheelite concentrate charge is fed into the furnace by three screw feeders. There is a 1500mm×1800mm×500mm water pool on the side of the furnace. The hot tungsten iron is dug out from the furnace and immediately put into the water pool for rapid coo...
Embodiment 3
[0082] 1. Production site
[0083] The factory site of this embodiment is located in Shijiao Township, Beihu District, Chenzhou City, Hunan Province, and the factory covers an area of 6400m 2 .
[0084] 2. Production equipment
[0085] The main equipment includes: a tiltable three-phase open electric furnace, a transformer with a capacity of 4000kVA, the electrode is a self-baking electrode, and the electrode is fixed with a pneumatic spring clamping gripper. The shell is welded by 20mm thick steel plate. The whole furnace is placed on two semicircular rollers, and the tilt of the furnace is controlled by the lifting of the hydraulic cylinder to release the depleted slag. There is a feeding bin above the exhaust hood of the furnace, and the scheelite concentrate charge is fed into the furnace by three screw feeders. There is a 2000mm×2000mm×800mm water pool on both sides of the furnace. The hot tungsten iron is dug out from the furnace and immediately put into the water p...
PUM
| Property | Measurement | Unit |
|---|---|---|
| electrical resistivity | aaaaa | aaaaa |
| diameter | aaaaa | aaaaa |
| diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 