A treatment method, nickel chloride technology, applied in the field of leaching slag washing and leaching of slag nickel in nickel smelting hydrometallurgy, can solve the problems affecting the recovery rate of nickel metal, etc., and achieve convenient operation, low nickel content, and simple process Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0009] Add nickel chloride leaching slag to the steam condensed water formed during the evaporation process of nickel chloride production to make a slurry with a volume ratio of nickel chloride leaching slag and washing liquid of 1:4, control the temperature at 85°C, and then pass it into The oxidation-reduction potential is controlled by chlorine gas at 460mv, the aging reaction is carried out for 4.5 hours, and the slag-liquid separation is carried out to obtain nickel chloride leaching slag containing less than 5% nickel.
[0010] Comparison of nickel content in nickel chloride leaching slag before washing and after washing %
[0011] The leaching slag contains nickel before washing 7.89 8.21 6.45 8.91 7.86 The leached slag contains nickel after washing 3.46 3.56 3.41 3.52 3.28
Embodiment 2
[0013] Add nickel chloride leaching slag to the steam condensed water formed during the evaporation process of nickel chloride production to make a slurry with a volume ratio of nickel chloride leaching slag and washing liquid of 1:4, control the temperature at 87°C, and then pass it into The oxidation-reduction potential is controlled by chlorine gas at 450mv, the aging reaction is carried out for 4.2 hours, and the slag-liquid separation is carried out to obtain nickel chloride leaching slag containing less than 5% nickel.
[0014] Comparison of nickel content in nickel chloride leaching slag before washing and after washing %
[0015] The leaching slag contains nickel before washing 8.76 6.78 7.69 9.21 7.98 The leached slag contains nickel after washing 2.21 3.16 3.42 3.64 3.69
Embodiment 3
[0017] Add nickel chloride leaching slag to the steam condensed water formed during the evaporation process of nickel chloride production, make a slurry with a volume ratio of nickel chloride leaching slag and washing liquid of 1:4, control the temperature at 90°C, and then pass it into The oxidation-reduction potential is controlled by chlorine gas at 440mv, the aging reaction is carried out for 4.0 hours, and the slag-liquid separation is carried out to obtain nickel chloride leaching slag containing less than 5% nickel.
[0018] Comparison of nickel content in nickel chloride leaching slag before washing and after washing %
[0019] The leaching slag contains nickel before washing 9.21 8.76 8.21 7.89 7.86 The leached slag contains nickel after washing 3.64 3.81 4.06 3.46 3.28