Blasting pile-forming method for three-stage bottom-enlarging prefabricated and cast-in-situ steel concrete combination pile body
A technology of cast-in-place steel concrete and combined piles, which is applied to sheet pile walls, buildings, and foundation structure engineering, and can solve problems such as attenuation of bearing capacity, large bearing capacity at the loss end, and difficulty in quality assurance, so as to ensure project quality and improve Carrying capacity, high degree of safety effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0016] Fig. 1a-Fig. 1g are the schematic diagrams of the construction state of the main process of the present invention. The blasting pile forming method of three-stage bottom-expanding prefabricated and cast-in-place steel-concrete combined pile body of the present invention comprises the following process steps: a, the sinking tube 2 with the metal pile head sinks into the hard soil layer to the design elevation; b, takes out the metal Pile head; c. Put emulsified oil or ammonium antimony explosives from the immersed tube mouth, every 0.5m 3 The dosage is 1-5 kg. After the explosive is detonated, the mouth of the immersed tube is sealed. After the explosion of the explosive is completed, the article that seals the mouth of the immersed tube is opened to form the lower base space 1. Except for those processed by a molding machine, there should be no residual debris in it. Soil, the broken soil is usually cleaned with soil suction equipment or dry-wet mixing method, and the b...
Embodiment 2
[0018] As shown in Fig. 2a and Fig. 2b, its process a to c is the same as embodiment 1, and process d processes the upper base space 6, the lower prefabricated solid pile body 3, after the broken soil is taken clean by soil suction equipment, the long Steel bars 8 are lowered from top to bottom from the immersed tube 2 to run through the upper middle section and pass through a point below the middle base; e, pour concrete into the middle and upper base, and the middle and upper sections of cast-in-place steel concrete piles; f, take out the immersed tube 2, and form a pile . As shown in Figure 8-9.
[0019] The specific steps of getting the clean crushed soil in the operation c described in embodiment 1 and embodiment 2 are as follows: take the soil with the air suction soil equipment, when there is only a small amount of loose soil in the base, pour water from the mouth of the immersed tube, and pour water on the side Suck it off until the soil is clean.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com