Preparation method for preformed hole fender pile
A technology of retaining piles and reserved holes, which is applied in the direction of sheet pile walls, manufacturing tools, molds, etc., can solve the problems of unsuitable deep base projects, high project cost, complex construction, etc., and achieve convenient construction organization and short construction period , the effect of convenient transportation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0048] Preserved holes for retaining piles, such as Figure 1 ~ Figure 3 shown.
[0049] The above-mentioned enclosure pile is a solid pile, and its processing method is as follows:
[0050] a, prepare the steel cage skeleton;
[0051]b. Prepare high-performance concrete and prepare matching molds, and apply isolation lubricant on the molds;
[0052] c. Install the reinforcement cage on the mold and tighten the tension device;
[0053] d. According to the flexural performance of the product, pre-tension the steel bar, lock and anchor after meeting the requirements; do not stretch the steel bar if there is no pre-stress requirement;
[0054] e. Feed the prepared high-performance concrete into the steel mold, and start the vibration equipment at the same time to vibrate and compact;
[0055] f. Demoulding after steam curing;
[0056] g. The finished products shall be stacked according to the requirements of cement hardening, and shall be cured naturally or with water accord...
Embodiment 2
[0063] Preserved holes for retaining piles, such as Figure 4 ~ Figure 6 shown.
[0064] Above-mentioned enclosure pile is hollow pile, and its processing method is:
[0065] a, prepare the steel cage skeleton;
[0066] b. Prepare high-performance concrete and matching molds, and apply isolation lubricant on the molds;
[0067] c. Install the reinforcement cage on the mold and tighten the tension device;
[0068] d. Feed the prepared high-performance concrete into the steel mold, pre-tension the steel bars according to the bending resistance of the product, and lock and anchor after reaching the required value;
[0069] E, put into centrifuge and carry out centrifugation and pour out the remaining pulp;
[0070] f. Demoulding after steam curing;
[0071] g. The finished products shall be stacked according to the requirements of cement hardening, and shall be cured naturally or with water according to the requirements of cement hardening.
[0072] The dry weight component...
Embodiment 3
[0078] Preserved holes for retaining piles, such as Figure 7 shown.
[0079] The above-mentioned enclosure pile is a solid pile, and its processing method is as follows:
[0080] a. Prepare high-performance concrete and matching molds, and apply isolation lubricant on the molds;
[0081] b. Feed the prepared high-performance concrete into the steel mold;
[0082] c, put it into the centrifuge and centrifuge and pour out the remaining slurry;
[0083] d. Demoulding after steam curing;
[0084] e. The finished products are stacked according to the requirements of cement hardening, and are naturally cured or water cured according to the requirements of cement hardening.
[0085] The dry weight components of the above isolation lubricant are: 10 parts by weight of sodium alginate, 3 parts of monoglyceride stearate, 3 parts of fatty acid monoethanolamide, 5 parts of paraffin, 80 parts of filler talcum powder, mixed with 5 times of water by parts by weight Uniform;
[0086] T...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com