A twin crystal induced plasticity, casting and rolling technology, applied in the field of metallurgy, can solve the problems of reducing material utilization rate, production environment pollution, increasing infrastructure investment, etc., to improve the static delayed fracture resistance, reduce dust pollution, and reduce infrastructure investment Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
example 1
[0018] example 1: (1) The weight percentages are: C: 0.01%, Mn: 17%, Al: 0.01%, Si: 0.01%, P: 0.009%, S: 0.008%, V: 0.03%, and the balance is Fe ingredient , Under the protection of argon, it is smelted in an intermediate frequency induction furnace, and all the components are dissolved to form molten steel;
[0019] (2) While the molten steel is smelted, the tundish must be baked, the side sealing plate is put into the heating furnace and heated to a temperature of 800°C, and the heated side sealing plate is installed in the casting and rolling mill before the molten steel is poured. And then pouring molten steel;
[0020] (3) Under the protection of argon gas, the molten steel is poured into the above-mentioned casting and rolling mill for casting, the casting speed is 15m / min, the casting force is 60KN, the rolls are cooled by circulating water, and finally cast and rolled into a 2mm thin strip;
[0021] (4) After the thin strip is air-cooled or water-quenched to room temperature...
example 2
[0022] Example 2: (1) The percentage by weight is: C: 0.1%, Mn: 30%, Al: 1%, Si: 1%, P: 0.008%, S: 0.008%, La: 0.2%, the balance is Fe ingredient , Smelting in an intermediate frequency induction furnace under the protection of argon gas, after all the components are dissolved, add a slag accumulation agent to remove slag to form molten steel;
[0023] (2) While the molten steel is smelted, the tundish must be baked, the side sealing plate is put into the heating furnace to heat up to 1000°C, and the heated side sealing plate is installed in the casting and rolling mill before the molten steel is poured. And then pouring molten steel;
[0024] (3) Under the protection of argon, the molten steel is poured into the above-mentioned casting and rolling mill for casting, the casting speed is 15m / min, the casting force is 60KN, the rolls are cooled by circulating water, and finally cast and rolled into a 4mm thin strip;
[0025] (4) After the thin strip is air-cooled or water-quenched t...
PUM
| Property | Measurement | Unit |
|---|---|---|
| thickness | aaaaa | aaaaa |