Isolation waterproof filling method for treating surface layer of highway foundation
A surface treatment and foundation technology, applied in roads, roads, buildings, etc., can solve the problems of complex construction technology, high cost, difficult pressure stabilization and molding, etc., to achieve the effect of ensuring the quality of the base, simple construction technology, and excellent waterproof performance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0025] Example 1: 0K+000—3K+200 in the section from Liancheng to Shihu of Provincial Highway 327 is the unilateral widening section of the old road. The following specific steps are used to treat the original side ditch on the side of the old road before filling the subgrade:
[0026] (1) Ground surface treatment: surface cleaning of the original ground or desilting of ditches and ponds;
[0027] (2) Drainage and precipitation operations: Ditching and setting up a drainage system, using pumps to pump out surface water, and lowering the water level of the construction work surface;
[0028] (3) Laying of waterproof cloth: laying of waterproof geotextile, and the joints of waterproof geotextile shall be overlapped with a width of 1.0 meters;
[0029] (4) Pave lime soil: Spread a layer of evenly mixed 50 cm thick lime soil on the waterproof cloth, level it, and press it 3 times with crawler machinery; among them, the lime soil is lime with a content of 6% and a content of 94%. m...
Embodiment 2
[0032] Example 2: 5K+000-8K+000 in the Liancheng-Shihu section of Provincial Highway 327 is a new road section. The foundation soil of this road section is sandy soil, and the groundwater level is relatively high. The soil has been treated before filling of the subgrade:
[0033] (1) Ground surface treatment: surface cleaning of the original ground or desilting of ditches and ponds;
[0034] (2) Drainage and precipitation operations: Ditching and setting up a drainage system, using pumps to pump out surface water, and lowering the water level of the construction work surface;
[0035] (3) Laying waterproof cloth: laying waterproof plastic cloth, and the joints of the waterproof cloth are overlapped with a width of 1.2 meters;
[0036] (4) Pave lime soil: Spread a layer of evenly mixed 55 cm thick lime soil on the tarpaulin, level it, and press it 4 times with crawler machinery; among them, the lime soil is lime with a content of 6% and a lime soil with a content of 94%. mixe...
Embodiment 3
[0039] Example 3: 12K+800—13K+000 in the Liancheng-Shihu section of Provincial Highway 327 is a new road section. There is a relatively large pond in this road section. The following steps are used to treat it before filling the roadbed:
[0040] (1) Ground surface treatment: surface cleaning of the original ground or desilting of ditches and ponds;
[0041] (2) Drainage and precipitation operations: Ditching and setting up a drainage system, using pumps to pump out surface water, and lowering the water level of the construction work surface;
[0042] (3) Laying of waterproof cloth: laying of waterproof geotextile, and the joints of the waterproof cloth shall be overlapped with a width of 1.5 meters;
[0043] (4) Pave lime soil: Spread a layer of evenly mixed 60 cm thick lime soil on the waterproof cloth, level it, and press it 4 times with crawler machinery; among them, the lime soil is lime with a content of 6% and a content of 94%. mixed with plain soil;
[0044] (5) Stan...