Horizontally laid large-section aluminum bus welding construction method
A technology of horizontal laying and construction methods, applied in welding equipment, welding accessories, manufacturing tools, etc., can solve problems such as welding deformation, reduce welding deformation and thermal cracks, increase deposition rate, and reduce porosity.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Example Embodiment
[0015] The welding construction method for horizontally laying large-section aluminum busbars described in the present invention is to fix a pair of aluminum busbars to be welded and place them in a welding pool crystallization tank with a heater. Semi-automatic melting pole MIG double pulse is used. At the same time of argon arc welding, the aluminum bar 2 is directly inserted into the molten pool as a filler welding material for welding. Before welding starts, both ends of the busbar welding part are preheated. The preheating temperature is 150-250℃. The temperature of the welding part of the aluminum bus bar 1 is in the range of 150-250 °C.
[0016] Since the melting point of aluminum is relatively low at 660.37°C, the excess heat of the molten pool is used to melt and fill the welding material to fill the weld, increase the deposition rate, reduce welding deformation, save welding materials, and improve working conditions. The production efficiency and welding quality can ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap