Long twist internal hole drilling and pressure pumping combined type reinforced concrete sheet pile

A reinforced concrete slab and long spiral technology, which is applied in sheet pile walls, excavation, construction, etc., can solve the problems of destroying the level of the construction site, large consumption of engineering materials, and serious environmental pollution, so as to avoid mud discharge and improve the quality of piles Guarantee and high efficiency

Inactive Publication Date: 2015-03-25
JIANGSU DINGDA BUILDING NEW TECH
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

These structural systems ensure the good engineering support of the pile foundation to a certain extent. However, the consumption of engineering materials is large, the construction period of the project is long, and the environmental pollution is serious. In the environment of energy saving and emission reduction, various support technologies need further improvement
Especially for hole-forming cast-in-place piles, the mud generated during the construction process not only pollutes the environment, is difficult to handle, but also destroys the leveling of the construction site and increases the cost.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Long twist internal hole drilling and pressure pumping combined type reinforced concrete sheet pile
  • Long twist internal hole drilling and pressure pumping combined type reinforced concrete sheet pile
  • Long twist internal hole drilling and pressure pumping combined type reinforced concrete sheet pile

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0026] The present invention is described in further detail now in conjunction with accompanying drawing. These drawings are all simplified schematic diagrams, which only illustrate the basic structure of the present invention in a schematic manner, so they only show the configurations related to the present invention.

[0027] Such as figure 1 , figure 2 , image 3 The construction process of the long auger inner hole pump pressure combined reinforced concrete sheet pile shown is as follows:

[0028] a. First, the drilling rig is in place, the drill bit is aligned with the pile site, the aperture at both ends is 600mm, and the aperture in the middle is 400mm;

[0029] b. When the drilling rig is started, 200mm of virtual soil will be formed at the same time when the drill bit reaches the design elevation;

[0030] c. Turn on the pressure pump in the long screw power head, pressurize to 8-12MPa, and open the one-way valve;

[0031] d. After the valve is opened, the pump ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a long twist internal hole drilling and pressure pumping combined type reinforced concrete sheet pile. The sheet pile is composed of four long twist internal hole drilling and pressure pumping reinforced concrete bored pile bodies. Firstly, a long twist drill is used for drilling a hole, after hole depth reaches design depth, a concrete pump is started to convey concrete to the underground position through core boring, concrete conveying and drill lifting are carried out at the same time until pouring is completed, meanwhile, three adjacent holes are drilled, grouting is carried out, finally, a reinforcement cage is placed in plain concrete in the four holes through self weight and a pressurization tool, and a sheet pile structure is formed. The sheet pile is a novel foundation pit supporting structure, and is fast in construction speed and high in efficiency, no vibration is generated by counter bores, noise and slurry discharge are avoided, hole shrinkage is reduced, the rigidity of a supporting body is enhanced, pile forming quality is guaranteed, energy saving and environmental protection are achieved, and the soil retaining function is achieved in the supporting process.

Description

technical field [0001] The invention relates to the technical field, in particular to a long auger inner hole pump pressure combined reinforced concrete sheet pile. Background technique [0002] In the prior art, the common pump-in-place pile with long auger drilling is a construction system composed of a long auger drilling machine, a concrete pump and a forced concrete mixer, and is widely used in pile foundation construction. The construction sequence is as follows: The drilling rig is in place, drill the hole to the predetermined elevation, pre-concrete, put the mixed concrete into the concrete pump hopper through the chute, start the concrete pump to pass the concrete through the conveying pipeline such as the core pipe of the drill pipe, and lift the drill while pumping the concrete until The surface becomes piles. The method of pumping in-pipe piles with long helical drilled holes is a pile with fast construction speed and wide adaptability. 60mm pebble layer. [0...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D5/02E02D5/18E02D17/04
CPCE02D5/02E02D17/04
Inventor 夏雄先礼琼吴炎
Owner JIANGSU DINGDA BUILDING NEW TECH