Fully mechanized coal mining face advanced abutment pressure zone deep-hole grouting material and preparation method
A fully-mechanized mining face and grouting material technology, which is applied in the field of deep-hole grouting materials and its preparation in the advanced bearing pressure area of fully-mechanized mining face, can solve the problems of poor injectability, flammability, and low early strength, and achieve Simplify the preparation and grouting process, improve the injectability and fluidity, and improve the effect of early strength
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0019] The preparation method of the deep hole grouting material in the advanced supporting pressure zone of the fully mechanized coal mining face of the present embodiment is as follows:
[0020] Take 100kg of ultra-fine cement, 2kg of early strength agent, 1kg of water reducing agent, and 0.5kg of suspending agent, put them in the mixing equipment and mix for 30min, and mix well; take 50kg of the above-mentioned mixture and put it in a mixer, press 0.6:1 of water Add 30kg of water to the ash ratio and stir for 5-10 minutes to prepare the grouting material; put the mixed slurry in a forming mold, and place the forming material in a standard concrete curing box for curing.
Embodiment 2
[0022] The preparation method of the deep hole grouting material in the advanced supporting pressure zone of the fully mechanized coal mining face of the present embodiment is as follows:
[0023] Take 100kg of ultra-fine cement, 2kg of early strength agent, 0.5kg of water reducing agent, and 1.0kg of suspending agent, put them in the mixing equipment and mix for 30min, and mix well; take 50kg of the above-mentioned mixture and put it in the mixer, according to 0.8:1 Add 40kg of water to the water-cement ratio and stir for 5-10 minutes to prepare the grouting material; put the mixed slurry in a forming mold, and place the forming material in a standard concrete curing box for curing.
Embodiment 3
[0025] The preparation method of the deep-hole grouting material in the advanced supporting pressure zone of the fully mechanized coal mining face of this embodiment is as follows:
[0026] (1) Put 100kg of ultrafine cement, 1.5kg of early strength agent (sodium sulfate), 0.5kg of water reducing agent (naphthalene superplasticizer) and 0.5kg of suspending agent (sodium carboxymethyl cellulose) in the mixture according to the ratio Mix for 20 minutes in the material equipment;
[0027] (2) Take 50kg of the above-mentioned mixture, add 30kg of water according to the water-cement mass ratio of 0.6:1, fully stir in a mixer to obtain early-strength deep-hole grouting material for mines. The initial setting time is greater than 45min, the final setting time is greater than 4h, and the uniaxial compressive strength at 3d age is greater than 20MPa.
PUM
| Property | Measurement | Unit |
|---|---|---|
| compressive strength | aaaaa | aaaaa |
| compressive strength | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com
