A preventive maintenance and construction method technology, applied in the direction of on-site coagulation pavement, roads, building components, etc., can solve the problems of unreasonable amount of asphalt, hidden dangers of driving safety and waste of asphalt, etc., and avoid anti-skid performance. Attenuate, reduce safety hazards, enhance the effect of bonding performance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0060] 1 Raw material preparation
[0061] The modified emulsified asphalt is modified with MetWistek SBR1468 latex and emulsified with MetWistek 63d emulsifier. The fiber is made of glass fiber; the snow-melting agent is Mingmeidi environmentally friendly organic snow-melting agent; the gravel is made of basalt gravel.
[0062] 2 construction steps
[0063] (1) Material preparation and dosage: Configure modified emulsified asphalt. The oil-water ratio of the first and second layers of high-viscosity modified emulsified asphalt is 65. The oil-water ratio of the snow melting layer is 48, and the content of organic snow melting agent is 10%.
[0064] Preparation of modified emulsified asphalt:
[0065] 1011. First heat the asphalt to 100°C, and then add it to the emulsifier solution together with SBR latex to obtain a soap solution; the oil-water ratio of the asphalt and emulsifier solution is 65 or 48; the amount of SBR latex added is 3% of the asphalt mass %; The total mas...
Embodiment 2
[0076] 1 Raw material preparation
[0077] Modified emulsified asphalt is modified with SBR latex and emulsified with MetWistek emulsifier. The fiber is made of glass fiber; the snow-melting agent is Mingmeidi environmentally friendly organic snow-melting agent; the gravel is made of basalt gravel.
[0078] 2 construction steps
[0079] (1) Material preparation and dosage: Configure modified emulsified asphalt. The oil-water ratio of the first and second layers of high-viscosity modified emulsified asphalt is 65. The oil-water ratio of the asphalt snow-melting layer is 45, and the content of organic snow-melting agent is 13%.
[0080] Preparation of modified emulsified asphalt:
[0081] 1011. First heat the asphalt to 200°C, and then add it to the emulsifier solution together with SBR latex to obtain a soap solution; the oil-water ratio of the asphalt and emulsifier solution is 65 or 45; the amount of SBR latex added is 3% of the asphalt mass %; The total mass of emulsifie...
Embodiment 3
[0092] 1 Raw material preparation
[0093] Modified emulsified asphalt is modified with SBR latex and emulsified with MetWistek emulsifier. The fiber is made of glass fiber; the snow-melting agent is Mingmeidi environmentally friendly organic snow-melting agent; the gravel is made of basalt gravel.
[0094] 2 construction steps
[0095] (1) Material preparation and dosage: Configure modified emulsified asphalt. The oil-water ratio of the first and second layers of high-viscosity modified emulsified asphalt is 65. The amount is 1.4kg / m 2 , the oil-water ratio of the asphalt snow-melting layer is 55, and the content of organic snow-melting agent is 15%.
[0096] Preparation of modified emulsified asphalt:
[0097] 1011. First heat the asphalt to 150°C, and then add it to the emulsifier solution together with SBR latex to obtain a soap solution; the oil-water ratio of the asphalt and emulsifier solution is 65 or 55; the amount of SBR latex added is 3% of the asphalt mass %; ...