[0035] A preparation process for electroplated gold steel wire, comprising the following steps:
[0036] (1) Paying off, choose a steel wire with a diameter of 0.05mm as the busbar, and use a payoff machine to pay off the wire. When paying off, control the tension of the busbar to 3N, and the payoff speed is 5 / min;
[0037] (2) The first alkali washing, the busbar is placed in the first alkali washing tank equipped with sodium hydroxide for the first alkali washing, and the temperature of the alkali solution is controlled at 30°C and PH9;
[0038] (3) The second alkali washing, the bus is placed in the alkaline cleaning pool containing cleaning agent for the second alkali washing to remove the grease and other dirt on the surface of the bus;
[0039] (4) pickling, put the bus bar after the second alkali washing in the pickling tank for pickling, control the temperature of the acid solution at 25°C, and pH≦5;
[0040] (5) pre-plating, the bus bar is placed in the electroplatin...
Embodiment 2
[0051] A preparation process for electroplated gold steel wire, comprising the following steps:
[0052] (1) Paying off, select a steel wire with a diameter of 0.08mm as the busbar, and use a payoff machine to pay off the wire. When paying off, the tension of the busbar is controlled to be 17N, and the payoff speed is 28m / min;
[0053] (2) The first alkali washing, the busbar is placed in the first alkali washing tank equipped with sodium hydroxide for the first alkali washing, and the temperature of the alkali solution is controlled at 50°C and PH11;
[0054] (3) The second alkali washing, the bus is placed in the alkaline cleaning pool containing cleaning agent for the second alkali washing to remove the grease and other dirt on the surface of the bus;
[0055] (4) pickling, put the bus bar after the second alkali washing in the pickling tank for pickling, control the temperature of the acid solution at 25°C, and pH≦5;
[0056] (5) pre-plating, the bus bar is placed in the ...
Embodiment 3
[0067] A preparation process for electroplated gold steel wire, comprising the following steps:
[0068] (1) Paying off, select a steel wire with a diameter of 0.1mm as the busbar, and use a payoff machine to pay off the wire. When paying off, control the tension of the busbar to 30N and the payoff speed to 50m / min;
[0069] (2) The first alkali washing, the busbar is placed in the first alkali washing pool equipped with sodium hydroxide for the first alkali washing, and the temperature of the alkali solution is controlled at 70°C and the pH is 12;
[0070] (3) The second alkali washing, the bus is placed in the alkaline cleaning pool containing cleaning agent for the second alkali washing to remove the grease and other dirt on the surface of the bus;
[0071] (4) pickling, put the bus bar after the second alkali washing in the pickling tank for pickling, control the temperature of the acid solution at 25°C, and pH≦5;
[0072] (5) pre-plating, the bus bar is placed in the ele...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Diameter | aaaaa | aaaaa |
| Diameter | aaaaa | aaaaa |
| Thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More