Horizontal continuous feeding and preheating device and strengthened preheating method thereof
A preheating device and horizontal technology, which is applied in the field of metallurgy, can solve the problems of insufficient heat exchange between burner gas and scrap steel, large channel area, and low thermal efficiency, and achieve enhanced preheating effect, improved heat transfer effect, and improved thermal efficiency. Effect
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2017-12-12
Smart Images

Figure 1 
Figure 2
Abstract
Description
technical field
[0001] The invention belongs to the technical field of metallurgy, and in particular relates to a horizontal continuous feeding preheating device and an intensified preheating method thereof. Background technique
[0002] Energy saving, environmental protection, and automation in electric arc furnace steelmaking are always one of the cores of the development of electric arc furnace steelmaking technology.
[0003] The scrap steel preheating electric arc furnace is an energy-saving electric arc furnace. The electric arc furnace scrap steel flue gas preheating technology that emerged in the late 1980s is a typical energy-saving technology, and the representative technology is CONSTEEL (US5400358). CONSTEEL technology has experienced nearly 30 years of development and has become relatively mature. Its flat molten pool smelting reduces the impact on the power grid, has the advantage of reducing the maintenance of the electric furnace body, and has a certain energ...
Examples
Embodiment Construction
[0035] The preferred embodiments of the present invention will be described in detail below with reference to the accompanying drawings.
[0036] As shown in the figure, the horizontal continuous feeding preheating device in the present invention includes a horizontal continuous feeding preheating duct 1 and an electric arc furnace 2, and the horizontal continuous feeding preheating duct 1 is provided with first The dust removal port 3 and the second dust removal port 4, the first dust removal port 3 is located behind the feed sealing port 5 of the horizontal continuous feeding preheating duct 1 and is close to the feed sealing port 5, and the second dust removal port 4 is located in the horizontal The rear section of the continuous feeding preheating duct 1 is close to the feed inlet of the electric arc furnace 2. The horizontal continuous feeding preheating duct between the two dust removal ports forms the first preheating zone I, and the second dust removal port 4 is connect...