Construction method of waterproof thermal-insulation roof
A construction method and waterproof coating technology, which is applied to building roofs, roof insulation materials, roofing, etc., can solve unsatisfactory problems and achieve the effects of rapid film formation, high elastic recovery rate, and high efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0017] A construction method for a waterproof and heat-insulating roof, the steps are as follows:
[0018] 1) Base treatment: First, treat the base of the building to be constructed to remove dust, dirt, mortar blocks and other attachments on the base to ensure that the base is flat, solid, clean and free of water;
[0019] 2) Construction of additional layer: after the treatment of the base layer, pour the non-cured rubber asphalt into the heating tank for heating. The scraping thickness is 2mm;
[0020] 3) Lay the insulation layer: Before laying the insulation layer, ensure that the additional layer is flat, dry and clean; the insulation board is close to the additional layer, paved flat, and the upper and lower layers are staggered when laying in layers, and the seams are tight; specifically, foam glass insulation boards are used;
[0021] 4) Use a brush to evenly coat the waterproof coating on the surface of the additional layer. The number of coatings is three times, and...
Embodiment 2
[0027] A construction method for a waterproof and heat-insulating roof, the steps are as follows:
[0028] 1) Base treatment: First, treat the base of the building to be constructed to remove dust, dirt, mortar blocks and other attachments on the base to ensure that the base is flat, solid, clean and free of water;
[0029] 2) Construction of additional layer: After the treatment of the base layer, pour the non-cured rubber asphalt into the heating tank for heating. The scraping thickness is 3mm;
[0030] 3) Lay the insulation layer: Before laying the insulation layer, ensure that the additional layer is flat, dry and clean; the insulation board is close to the additional layer, paved flat, and the upper and lower layers are staggered when laying in layers, and the seams are tight; specifically, foam glass insulation boards are used;
[0031] 4) Use a brush to evenly coat the waterproof coating on the surface of the additional layer. The number of coatings is three times, and...
Embodiment 3
[0037] A construction method for a waterproof and heat-insulating roof, the steps are as follows:
[0038] 1) Base treatment: First, treat the base of the building to be constructed to remove dust, dirt, mortar blocks and other attachments on the base to ensure that the base is flat, solid, clean and free of water;
[0039] 2) Construction of additional layer: after the treatment of the base layer, pour the non-cured rubber asphalt into the heating tank for heating. The scraping thickness is 3mm;
[0040] 3) Lay the insulation layer: Before laying the insulation layer, ensure that the additional layer is flat, dry and clean; the insulation board is close to the additional layer, paved flat, and the upper and lower layers are staggered when laying in layers, and the seams are tight; specifically, foam glass insulation boards are used;
[0041] 4) Use a brush to evenly coat the waterproof coating on the surface of the additional layer. The number of coatings is three times, and...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Thickness | aaaaa | aaaaa |
| Thickness | aaaaa | aaaaa |
| Thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information