A new type of modified bitumen waterproof membrane and its preparation method
A technology for modifying asphalt and waterproofing membranes, applied in asphalt layered products, chemical instruments and methods, and roofing using flexible materials, etc. High, the effect of improving the scope of application and service life
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0026] A preparation method of a novel modified bitumen waterproof coiled material, comprising the following steps:
[0027] S1. According to the following formula by weight, take each component for later use: 5 parts of 10# asphalt, 40 parts of 90# asphalt, 6 parts of softening oil, 4 parts of rubber powder, 3 parts of SBS, 2 parts of high-density polyethylene, three parts 0.2 parts of allyl isocyanurate, 0.6 parts of dicumyl peroxide, 10 parts of light calcium;
[0028] S2. Pour 10# asphalt and 90# asphalt into the batching tank, add softened oil when the temperature rises to 160±5°C, raise the temperature to 180±5°C, and stir for 30 minutes until evenly mixed;
[0029] S3. Control the temperature at 180-190°C, then add tire rubber powder, stir for 60 minutes until evenly mixed, then open the colloid mill, and grind for the first time to completely blend the rubber powder and oil;
[0030] S4. After the first grinding is completed, add SBS, stir for 30 minutes until it is e...
Embodiment 2
[0035] A preparation method of a novel modified bitumen waterproof coiled material, comprising the following steps:
[0036] S1. According to the following formula by weight, take each component for later use: 6 parts of 10# asphalt, 43 parts of 90# asphalt, 8 parts of softening oil, 5 parts of rubber powder, 4 parts of SBS, 3 parts of high-density polyethylene, three parts 0.3 parts of allyl isocyanurate, 1.0 parts of dicumyl peroxide, 13 parts of light calcium;
[0037] S2. Pour 10# asphalt and 90# asphalt into the batching tank, add softened oil when the temperature rises to 160±5°C, raise the temperature to 180±5°C, and stir for 30 minutes until evenly mixed;
[0038] S3. Control the temperature at 180-190°C, then add tire rubber powder, stir for 60 minutes until evenly mixed, then open the colloid mill, and grind for the first time to completely blend the rubber powder and oil;
[0039] S4. After the first grinding is completed, add SBS, stir for 30 minutes until it is e...
Embodiment 3
[0044]A preparation method of a novel modified bitumen waterproof coiled material, comprising the following steps:
[0045] S1. According to the following formula by weight, take each component for later use: 7 parts of 10# asphalt, 45 parts of 90# asphalt, 9 parts of softening oil, 5 parts of rubber powder, 4 parts of SBS, 3 parts of high-density polyethylene, three parts 0.4 parts of allyl isocyanurate, 1.2 parts of dicumyl peroxide, 15 parts of fly ash;
[0046] S2. Put 10# asphalt, 90# or 100# asphalt into the batching tank, add softening oil when the temperature rises to 160±5°C, heat up to 180±5°C, stir for 30 minutes until the mixture is uniform;
[0047] S3. Control the temperature at 180-190°C, then add tire rubber powder, stir for 60 minutes until evenly mixed, then open the colloid mill, and grind for the first time to completely blend the rubber powder and oil;
[0048] S4. After the first grinding is completed, add SBS, stir for 30 minutes until it is evenly mixe...
PUM
Property | Measurement | Unit |
---|---|---|
softening point | aaaaa | aaaaa |
softening point | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com