A kind of starting method of anaerobic ammonium oxidation process
An anammox and process technology, applied in anaerobic digestion treatment, chemical instruments and methods, biological treatment adjustment methods, etc., can solve the problem of slow growth of anammox bacteria and long start-up time of anaerobic nitrogen oxidation process, etc. question
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0054] step one:
[0055] Take the sludge from the bottom of the settling tank in a domestic sewage treatment plant and let it stand for concentration, discard the supernatant, and use the pre-configured inorganic salt solution (NaCl: 1000-1500mg / L, KH 2 PO 4 : 10mg / L, CaCl 2 : 50mg / L, MgSO 4 : 300mg / L) eluted 4 times, after each elutriation, let it stand for 1.5 hours and discard the supernatant, the purpose is to remove inorganic impurities and organic pollutants adsorbed on the sludge surface as much as possible. The sludge after elutriation and concentration is loaded into the EGSB reactor, and the amount of sludge accounts for about 1 / 2 of the effective volume of the reactor.
[0056] Step two:
[0057] Preparation of trace element nutrient solutions Ⅰ and Ⅱ:
[0058] Trace element nutrient solution Ⅰ: EDTA 5000mg / L, FeSO 4 5000mg / L;
[0059] Trace element nutrient solution Ⅱ: EDTA 5000mg / L, MnCl 2 4H 2 O 990mg / L, ZnSO 4 ·7H 2 O 430mg / L, CoCl 2 ·6H 2 O 240mg...
Embodiment 2
[0069] step one:
[0070] Take the sludge from the bottom of the settling tank in a domestic sewage treatment plant and let it stand for concentration, discard the supernatant, and use the pre-configured inorganic salt solution (NaCl: 1000-1500mg / L, KH 2 PO 4 : 10mg / L, CaCl 2 : 50mg / L, MgSO 4 : 300mg / L) eluted 4 times, after each elutriation, let it stand for 1.5 hours and discard the supernatant, the purpose is to remove inorganic impurities and organic pollutants adsorbed on the sludge surface as much as possible. The sludge after elutriation and concentration is loaded into the EGSB reactor, and the amount of sludge accounts for about 1 / 2 of the effective volume of the reactor.
[0071] Step two:
[0072] Preparation of trace element nutrient solutions Ⅰ and Ⅱ:
[0073] Trace element nutrient solution Ⅰ: EDTA 5000mg / L, FeSO 4 5000mg / L;
[0074] Trace element nutrient solution Ⅱ: EDTA 5000mg / L, MnCl 2 4H 2 O 990mg / L, ZnSO 4 ·7H 2 O 430mg / L, CoCl 2 ·6H 2 O 240mg...
PUM
| Property | Measurement | Unit |
|---|---|---|
| particle size | aaaaa | aaaaa |
| density | aaaaa | aaaaa |
| particle diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com

