Power transmission tower automatic modeling method and system based on building information model
An automatic modeling and transmission tower technology, applied in the field of power transmission and transformation, can solve problems such as heavy workload, insufficient information sharing, and repetitive modeling
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0117] From figure 1 It can be seen that an automatic modeling method for transmission towers based on building information models includes:
[0118] S1. Identify the rods of the transmission tower according to the tower load calculation results of the transmission tower;
[0119] Further, identifying the rods of the transmission tower according to the calculation results of the tower load of the transmission tower includes: obtaining the information of all the rods of the transmission tower based on the calculation results of the tower load of the transmission tower;
[0120] Based on all member information, identify the frontal outline of the transmission tower through the preset frontal outline recognition algorithm in the BIM model;
[0121] identifying a member of a preset type from members included in the outer contour line;
[0122] Among them, the preset types of members include: the main material of the tower body, the main material of the cross-arm and the transver...
Embodiment 2
[0179] S1. Identify the rods of the transmission tower according to the tower load calculation results of the transmission tower;
[0180] Specifically, including:
[0181] 1. Load calculation result interface definition
[0182] The load calculation software for transmission towers mainly includes Daoheng, iTower, and SmartTower. The cores of each load calculation software are basically the same. Therefore, based on the iTower load calculation software, the automatic modeling data interface for angle steel towers is stipulated. The information contained in the interface is as follows:
[0183] 1) Tower height and number of legs; 2) Node classification; distribution table; 3) Number of nodes; 4) Detailed information of nodes; 5) Number of main material segments; 6) Detailed information of segments; Number of rows; 8) Rod material code table; 9) Number of stress-bearing members and auxiliary members; 10) Detailed information of members.
[0184] in, figure 2 interface tower...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com