Engineering machinery part production line

A technology for construction machinery and parts, applied in the field of construction machinery parts production line, can solve the problems of inability to timely and effectively detect the processing quality of workpieces, high defective rate of final products, discontinuous production process, etc. Machining operations, the effect of reducing the accident rate

Inactive Publication Date: 2020-06-19
CHANGSHA LEIFENG HEAVY FORGING
View PDF8 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In most factory workshops, the pre-processing and cutting processing of construction machinery parts are generally carried out separately. For example, one workshop performs pre-processing and one workshop performs cutting operations. Manpower consumption leads to low production efficiency, and the production process is incoherent, which easily leads to waste of resources and energy. The processing quality of workpieces in each process cannot be detected in a timely and effective manner, which often leads to a high defective rate of final products, affecting output and wasting man-hours. cause economic loss

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Engineering machinery part production line

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0038] In order to enable those skilled in the art to better understand the technical solutions of the present invention, the present invention will be further described in detail below in conjunction with the accompanying drawings.

[0039] The present invention provides such figure 1 A production line for construction machinery parts shown, including material collection and processing procedures, parts rough processing, parts finishing processes, parts quality inspection procedures and packaging and transportation procedures, the material collection and processing procedures, parts rough processing The process, parts finishing process, parts quality testing process and packaging and transportation process are in one workshop, and the material collection and processing process, parts rough processing process, parts finishing process, parts quality testing process and packaging and transportation process are in accordance with Carried out sequentially, the specific steps are a...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses an engineering machinery part production line. The line involves a material collecting and machining procedure, a part rough machining procedure, a part finish machining procedure, a part quality detecting procedure and a packaging and transporting procedure, wherein the material collecting and machining procedure, the part rough machining procedure, the part finish machining procedure, the part quality detecting procedure and the packaging and transporting procedure are conducted in the same workshop. According to the production line, the production processes are highin consistency, the efficiency can be improved, the energy loss can be reduced, a part is roughly machined into a rough machined part, the finish machining allowance is reserved, finish machining is conducted after thermal refining to produce the standard part, in the whole production process, the machining quality and standard of the workpiece are tracked and detected many times, the non-standardpart is reworked and removed in time, standardized finish machining is facilitated, unnecessary machining operation is avoided, the yield is increased, the defective rate is reduced, and economic benefits are improved.

Description

technical field [0001] The invention relates to the technical field of parts processing and production, in particular to a construction machinery parts production line. Background technique [0002] Construction machinery is an important part of the equipment industry. The mechanical equipment necessary for comprehensive mechanized construction projects required for earthwork construction projects, road surface construction and maintenance, mobile lifting and loading and unloading operations, and various construction projects are called engineering. mechanical. Construction machinery is mainly used in national defense construction projects, transportation construction, energy industry construction and production, mining and other raw material industry construction and production, agriculture, forestry and water conservancy construction, industrial and civil construction, urban construction, environmental protection and other fields. Large-scale construction machinery is com...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): B23P23/06
CPCB23P23/06
Inventor 杨重科彭姣张宇
Owner CHANGSHA LEIFENG HEAVY FORGING
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products