A tunnel construction method in strong rockburst section in high altitude area

A tunnel construction and high-altitude technology, applied in tunnels, tunnel linings, earthwork drilling and mining, etc., can solve problems affecting process cycle time and construction progress, casualties and losses of personnel and machinery, and anxiety of construction workers, so as to ensure the process The effects of cycle time, reduction of construction risk, and reasonable construction process

Active Publication Date: 2021-06-22
RAILWAY NO 5 BUREAU GRP FIRST ENG CO LTD
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] Rock bursts have a great impact on tunnel construction. When they occur, they may cause casualties and losses to personnel and machinery. Operators and mechanical equipment on the face of the tunnel must be evacuated, and the uncertainty of rock bursts can easily lead to anxiety among construction workers. At the same time, the blast pit or over-excavation part formed after the rockburst must be backfilled and sprayed and anchored smooth to eliminate hidden dangers; in summary, on the one hand, rockburst may cause personnel or mechanical losses and high construction risks, and on the other hand may increase Engineering cost, affecting process cycle time and construction schedule

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0040] This embodiment provides a tunnel construction method in a high-altitude area with strong rockburst, which includes:

[0041] S1. Provide an overall advanced geological report: carry out conceptual model modeling and mathematical model modeling based on survey data, and preliminarily determine the magnitude of the ground stress in the construction area through three-dimensional finite element numerical calculations, inverse analysis and simulation of tunnel excavation procedures , The location and mileage where rockburst may occur during the construction process, and the rockburst level of each part;

[0042] S2. Provide on-site prediction report: conduct on-site prediction for the unfinished section to be constructed, compare the predicted results of the unfinished section to be constructed with the actual measurement results of the completed section, and determine the rockburst location in the unfinished section to be constructed and the rockburst level of each part, ...

Embodiment 2

[0057] This embodiment provides a tunnel construction method in a high-altitude area with strong rockburst, which includes:

[0058] S1. Provide an overall advanced geological report: carry out conceptual model modeling and mathematical model modeling based on survey data, and preliminarily determine the magnitude of the ground stress in the construction area through three-dimensional finite element numerical calculations, inverse analysis and simulation of tunnel excavation procedures , The location and mileage where rockburst may occur during the construction process, and the rockburst level of each part;

[0059] S2. Provide on-site prediction report: conduct on-site prediction for the unfinished section to be constructed, compare the predicted results of the unfinished section to be constructed with the actual measurement results of the completed section, and determine the rockburst location in the unfinished section to be constructed and the rockburst level of each part, ...

Embodiment 3

[0074] This embodiment provides a tunnel construction method in a high-altitude area with strong rockburst, which includes:

[0075] S1. Provide an overall advanced geological report: carry out conceptual model modeling and mathematical model modeling based on survey data, and preliminarily determine the magnitude of the ground stress in the construction area through three-dimensional finite element numerical calculations, inverse analysis and simulation of tunnel excavation procedures , The location and mileage where rockburst may occur during the construction process, and the rockburst level of each part;

[0076]S2. Provide on-site prediction report: conduct on-site prediction for the unfinished section to be constructed, compare the predicted results of the unfinished section to be constructed with the actual measurement results of the completed section, and determine the rockburst location in the unfinished section to be constructed and the rockburst level of each part, a...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a tunnel construction method in a high-altitude region with severe rockburst, which includes: S1, providing an overall advanced geological report; S2, providing an on-site prediction report; S3, advanced support construction; S4, advanced stress release; S5, Tunnel excavation; S6, drainage treatment for water gushing; S7, initial support construction; S8, after the initial support is completed, grouting reinforcement is performed on the predicted rockburst occurrence site; S9, laying a waterproof layer on the surface of steel fiber concrete layer, and use geotextile protection; then carry out inverted arch and second lining construction; the tunnel construction method of the strong rockburst section in the high altitude area of ​​the present invention can predict the possibility of rockburst in advance and take corresponding measures to reduce or avoid the risk of rockburst In order to ensure the safety of construction personnel and mechanical equipment, and to ensure the process cycle time and construction progress.

Description

technical field [0001] The invention relates to the field of tunnel construction, in particular to a tunnel construction method in areas with strong rockbursts in high-altitude areas. Background technique [0002] With the vigorous development of national transportation construction, with the continuous development of my country's construction industry and the continuous innovation of construction technology, there are more and more rock operations such as tunnels. With the increase of rock mass depth, the geological environment is more complex and the ground stress is more severe. High, the engineering geological disaster rockburst induced by excavation is more prominent and serious. Rockburst is a phenomenon in which the hard and brittle surrounding rock is affected by the differentiation and concentration of ground stress during the excavation of underground engineering, causing the elastic strain energy stored in the rock mass to be released suddenly, resulting in burstin...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): E21D11/10E21D9/00E21D11/15E21D11/18E21D11/38E21F16/02E21F17/18E21F17/00
CPCE21D9/006E21D11/10E21D11/107E21D11/152E21D11/18E21D11/38E21F16/02E21F17/00E21F17/18
Inventor 杨文国刘飞翔陈彬谢晓波李一萍彭学军徐毅勇汤宇刘晓凯郑文豪苗宪强艾亮杨曾杨俊峰阳军生吴彪林巍杰胡从文智绪金赵建斌陈敏刘德安罗朝华
Owner RAILWAY NO 5 BUREAU GRP FIRST ENG CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products