Preparation method of ductile retarding fine aggregate concrete with initial setting time of 48-72 hours

A technology of fine stone concrete and initial setting time, applied in the field of building construction, can solve the problems of construction cold joints and long pouring time, and achieve the effects of improving later strength, improving ductility, and improving workability

Active Publication Date: 2020-08-14
JIANGSU WATER CONSERVANCY SCI RES INST +5
View PDF8 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] Walls with a height of more than 10m require a long pouring time. If the pouring process is suspended for some reason, cold construction joints may be formed

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0047] 1. Project objectives:

[0048] A sluice project is a general environmental hydraulic structure in an inland river, with 5 holes and a clear width of 10m per hole. The length of the gate pier is 30m, the height is 12m, the thickness of the middle pier is 1.8m, and the thickness of the side pier and seam pier is 1.2m. For structural parts such as floor plates and gate piers, the concrete design strength grade is C30, the frost resistance grade is F50, and the impermeability grade is W6.

[0049] In order to prevent temperature cracks during the construction of the gate pier, when pouring the gate pier, a layer of C30 ductile retarded fine stone concrete with a thickness of 20cm is first poured at the root of the gate pier, and the initial setting time of the concrete is 60-70h.

[0050] Second, the preparation of concrete:

[0051] 1. Raw material equipment:

[0052] (1) Cement.

[0053] 42.5 Ordinary Portland cement, the cement strength meets the requirements of the...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

PropertyMeasurementUnit
specific surface areaaaaaaaaaaa
specific surface areaaaaaaaaaaa
breaking strengthaaaaaaaaaa
Login to view more

Abstract

The invention discloses a preparation method of ductile retarding fine aggregate concrete with initial setting time of 48-72 hours, belongs to the technical field of building construction, and particularly relates to a preparation technology of the ductile retarding fine aggregate concrete. Cement, fly ash, slag powder and a reinforcing compacting agent are adopted to form a cementing material, and the fly ash, the slag powder and the reinforcing compacting agent not only improve the performance of a concrete mixture, but also can improve the early-stage or later-stage strength of concrete, improve the pore structure and improve the compaction performance of the concrete; meanwhile, the effects of saving resources and protecting the environment are achieved. The concrete is suitable for pier wall reinforced concrete structures in the fields of construction engineering, water conservancy engineering, traffic engineering, water transportation engineering and the like, a layer of ductileretarding concrete is poured at the root of the pier wall, and the concrete can also be suitable for underground secant piles and structural construction joints needing to be poured by several times.

Description

technical field [0001] The invention belongs to the technical field of building construction, and in particular relates to the preparation technology of ductile retarded fine stone concrete. Background technique [0002] At present, the problem of pier wall cracking in reinforced concrete buildings in the fields of construction engineering, water conservancy engineering, traffic engineering, water transportation engineering, etc. is prominent, which is caused by temperature shrinkage, autogenous shrinkage, plastic shrinkage, drying shrinkage, etc. When the deformation is constrained by the substructure, temperature stress is generated. Ordinary concrete has high compressive strength, but low tensile strength, the tensile strength is only 1 / 8-1 / 13 of the compressive strength, the modulus of elasticity is high, and the ductility of concrete is low; when the temperature stress of concrete exceeds the tensile strength When the strength is high, the concrete will crack. In orde...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): C04B28/04C04B111/20C04B111/22
CPCC04B28/04C04B2111/20C04B2111/22C04B2111/2038C04B14/02C04B14/06C04B18/08C04B18/141C04B2103/302C04B2103/304C04B2103/22C04B18/22C04B16/0658C04B22/066C04B18/146
Inventor 朱炳喜高文达黄根民蒋一波尚超军周阜军肖强陈远兵王学刚尚志清陈南王小勇袁尧陈艳丽夏祥林张良群朱维
Owner JIANGSU WATER CONSERVANCY SCI RES INST
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products