Circulating reinjection well washing system and well washing method
A technology of circulating back and well washing, applied in separation methods, flushing wellbore, wellbore/well components, etc., can solve the problems of insufficient well liquid supply capacity, abnormal operation of screw pump, and underground fly ash accumulation, etc. Achieve the effect of shortening the pump inspection cycle, reducing additional costs, and increasing gas production
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0054] In the early drainage and depressurization stage of coalbed methane wells, no circulation reinjection system is needed, only direct drainage system is required.
[0055] A method of circulating reinjection well flushing provided in this embodiment adopts the following steps and methods:
[0056] In the early drainage and depressurization stage of the coalbed methane well, the liquid production of the well itself is sufficient, and the circulation reinjection system can be closed and the direct system can be opened. With the direct discharge valve 3.1 in the open state and the reinjection valve 5.9.1 in the closed state, the water extracted by the electric submersible screw pump 1 in the well is directly discharged into the evaporation pool 7 through the produced water direct discharge pipeline 3 .
Embodiment 2
[0058] The circular reinjection well washing method provided in this embodiment is mainly used in the stage of insufficient liquid supply in the middle and later stages of coalbed methane well drainage, or when there is fly ash in the well and the well liquid supply is insufficient. Insufficient coal ash capacity leads to the downhole blockage of fly ash deposited in the liquid passage of the unit. The following steps and methods are adopted:
[0059] The direct discharge valve 3.1 is in the closed state, the reinjection valve 5.9.1 is in the open state, the valve at the outlet end of the produced water tank pipeline 5.9 and the valve at the water inlet end of the first high-pressure pipeline 5.1 are opened, and the overflow The valve provided at the water inlet of the pipeline is opened, and the valve at the sewage outlet 4.6 is closed. Only when the water injection tank 4 is regularly cleaned, the valve at the sewage outlet 4.6 is in an open state.
[0060] The booster pump ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com


