Mining roadway protection treatment method
A technology of roadway and protective agent, applied in mining equipment, tunnels, tunnel linings, etc., can solve the problems of inconvenient construction, complicated methods, affecting coal quality, etc., and achieve the effect of simple construction, few steps, and reducing roadway accidents.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0022] Embodiment one: a kind of method for mining roadway protective treatment, the method for this mining roadway protective treatment comprises the following steps:
[0023] A: Preparation of protective material: the material is composed of 30-40 parts of 40% vinyl chloride-vinyl isobutyl ether copolymer resin solution, 5-10 parts of concrete protective agent, 5-10 parts of solvent, wetting and dispersing agent A uniform dispersion of 0.5-1 parts, 0.1-0.5 parts of thixotropic agent, and 10-20 parts of filler;
[0024] B: Irrigate the roadway wall: spray water on the roadway wall through the water pipe and nozzle to make it evenly spray;
[0025] C: dry; the roadway wall after spraying dries naturally, and the time is 12-24 hours;
[0026] D: spraying; use a spraying machine to evenly spray the protective material to the roadway surface;
[0027] E: Fast air drying: set up a fan at the entrance of the roadway to speed up the air flow in the roadway;
[0028] F: set the ro...
Embodiment 2
[0030] Embodiment two: a kind of method for mining roadway protective treatment, the method for this mining roadway protective treatment comprises the following steps:
[0031] A: Preparation of protective material: the material is composed of 35 parts of 40% vinyl chloride-vinyl isobutyl ether copolymer resin solution, 8 parts of concrete protective agent, 8 parts of solvent, 0.8 part of wetting and dispersing agent, thixotropic agent A uniform dispersion of 0.2-0.4 parts and 15 parts of filler;
[0032] B: Irrigate the roadway wall: spray water on the roadway wall through the water pipe and nozzle to make it evenly spray;
[0033]C: dry; the roadway wall after spraying dries naturally, and the time is 16 hours;
[0034] D: spraying; use a spraying machine to evenly spray the protective material to the roadway surface;
[0035] E: Fast air drying: set up a fan at the entrance of the roadway to speed up the air flow in the roadway;
[0036] F: set the roadway roof protectio...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More