Method for producing form coke from Jurassic steam coal
A thermal coal and semi-coke technology, which is applied in coking ovens, special dry distillation, petroleum industry, etc., can solve the problems of affecting the amount of coal tar and not removing coal tar, and achieves low production cost, low environmental pollution and good quality Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0021] (1) Pulverize Jurassic steam coal with a pulverizer to a particle size of 0-5mm, wash and dry through a flotation machine system and a jig system to make washed raw coal.
[0022] (2) Put the cleaned raw coal into an external-combustion and internal-heating vertical carbonization furnace and dry distillation at a high temperature of 950°C for 10 hours to obtain high-temperature coal tar and semi-coke, which are pulverized with a pulverizer until the particle size is below 0.8mm to make Jurassic Ji thermal coal semi-coke powder.
[0023] (3) Crush the coking coal to a particle size of 0-5 mm, wash and dry it through a flotation machine system and a dense medium washing machine system to obtain washed caking coal, and crush it with a pulverizer until the particle size is below 0.4 mm. Become coking coal powder binding agent, fat coal adopts the same method to make fat coal powder binding agent.
[0024] (4) Coal tar is made into tar pitch binder after 250~300 ℃ of distil...
Embodiment 2
[0032] In this example, in the preparation process of Jurassic thermal coal semi-coke powder, the washed raw coal is loaded into an external combustion and internal heating vertical carbonization furnace and subjected to high-temperature dry distillation at 1150°C for 4 hours to obtain high-temperature coal tar and semi-coke .
[0033] In the preparation process step of coal briquette, the weight proportion of used mixture raw material is as follows:
[0035] Coking coal (caking index G is 110) powder binder 15%
[0036] Jurassic Thermal Coal Semi-coke Powder Added to 100%
[0037] Put the briquettes into an external-combustion and internal-heating vertical carbonization furnace and carbonize them at 1150°C for 5 hours to make briquettes. Other steps of the form coke preparation method are the same as in Example 1.
Embodiment 3
[0039] In the process step of present embodiment briquette, the weight ratio of used mixture raw material is as follows:
[0041] Coking coal powder binder 25%
[0042] The other steps of the Jurassic thermal coal semi-coke powder added to 100% molded coke preparation method are the same as in Example 1.
PUM
Property | Measurement | Unit |
---|---|---|
Granularity | aaaaa | aaaaa |
Ash | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com