Synchronous anaerobic denitrification and desulfurization process
A denitrification and process technology, applied in the field of synchronous anaerobic denitrification and desulfurization process, can solve problems such as consumption
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Example Embodiment
[0012] Example 1
[0013] In the synchronous anaerobic denitrification and sulfur removal reactor, the anaerobic digested sludge of the municipal sewage treatment plant was used as the inoculum, and the simulated wastewater with the ratio of nitrite to sulfide (mol / mol) was about 2:3. Start the synchronous anaerobic nitrogen and sulfur removal reactor. The main process conditions controlled are: hydraulic retention time of 2.0 d, nitrite and sulfide (substrate) concentrations of 21 mg N / L and 32 mg S / L, respectively, reaction temperature of 30 °C, and pH of about 7. The process can remove sulfide and nitrite at the same time, the sulfide concentration in the effluent is less than 1 mgS / L, and the removal rates of sulfide and nitrite are 98.8% and 94.7%, respectively.
Example Embodiment
[0014] Example 2
[0015] The anaerobic digestion sludge of the municipal sewage treatment plant was used as the inoculum, and the simulated wastewater with the ratio of nitrite to sulfide (mol / mol) was about 12:3, and the denitrification and sulfur removal process was run. The main process conditions controlled: the hydraulic retention time is 1.0d, the concentration of nitrite and sulfide (substrate) is 3325mgN / L and 1900mgS / L, the reaction temperature is 35℃, and the pH value is about 7. The volumetric removal load of sulfide and nitrite reaches 1.918kgS / (m 3 d) and 2.03kg N / (m 3 d).
Example Embodiment
[0016] Example 3
[0017] The anaerobic digested sludge from the municipal sewage treatment plant was used as the inoculum to simultaneously remove sulfide and nitrite. The main process conditions controlled are: hydraulic retention time of 2.0 d, nitrite and sulfide (substrate) concentrations of 2270 mg N / L and 1920 mg S / L, respectively, reaction temperature of 30 °C, and pH of about 9. This process can remove sulfide and nitrite at the same time, and the volume removal load of sulfide and nitrite can reach 0.73kg S / (m 3 d) and 0.96kg N / (m 3 d).
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap