Greening method of cement mortar anchoring and shotcreting side slope
A cement mortar and slope technology, applied in the field of ecological restoration, can solve problems such as increased energy consumption, damage to ecological landscape, and difficult control of construction quality, so as to ensure stability, enhance protection effect, and ensure long-term stability and safety Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0028] Carry out afforestation to a cement mortar anchor shotcrete slope with the method of the present invention, specifically as follows:
[0029] (1) Clean up the cement mortar slope surface, remove or reinforce the severely weathered and broken parts of the slope surface, and clean the slope surface.
[0030] (2) Use a rock drill to drill holes on the slope to set root induction holes, with a diameter of 15cm and a depth of 20cm, about 5 holes / m 2 . These root induction holes provide a certain extension space for the plant root system, form a three-dimensional protection, and improve the soil-fixing ability of the plant root system.
[0031] (3) Drill holes on the slope along the contour line with a spacing of 1.5m. The drilling depth is generally 20cm, the hole diameter is 3cm, and the anchor rod with a length of 80cm and a diameter of 15mm is inserted and anchored with cement mortar grouting. Some ecological rods made of PP material, filled with vegetation substrate, a...
Embodiment 2
[0041] (1) Clean up the cement mortar slope surface, remove or reinforce the severely weathered and broken parts of the slope surface, and clean the slope surface.
[0042] (2) Drill holes with a rock drill on the slope to set root induction holes, with a diameter of 20cm, a depth of 40cm, and 7 holes / m 2 . These holes provide a certain extension space for the plant root system, form a three-dimensional protection, and improve the soil-fixing ability of the plant root system.
[0043] (3) Drill holes on the slope along the contour line with a spacing of 3m. The drilling direction is perpendicular to the slope. The drilling depth is generally about 30cm, the hole diameter is about 5cm, and the anchor rod with a length of 50cm and a diameter of 20mm is inserted and cement mortar For grouting and anchoring, an ecological rod with a diameter of 15cm made of PP material is placed above the exposed part of the anchor rod, filled with a vegetation matrix, and the ecological rod is f...
PUM
Property | Measurement | Unit |
---|---|---|
Aperture | aaaaa | aaaaa |
Depth | aaaaa | aaaaa |
Aperture | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com