Refining method for producing low alloy steel by refining and slagging of bauxite in LF (Ladle Furnace)
A low-alloy steel and bauxite technology, which is applied in the field of metallurgical refining outside the furnace, can solve the problems of short fluxing time of fluorite slag, increase the cost of refractory materials in iron and steel enterprises, and failure of fluorite fluxing, and achieve green The effect of polluting low-cost steelmaking production, conducive to rapid formation and reducing steelmaking costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037]The steel grade is ∮12mm HRB400, and the process route is: converter—LF refining—billet continuous casting machine. During the tapping process of the converter, bauxite, lime and silicon carbide are used to make refining pre-melted slag, and the lime used is 3.2kg. / ton of steel, bauxite is 2.1kg / ton of steel, silicon carbide is 1kg / ton of steel, the temperature of molten steel after tapping is 1581°C, and the slag in the ladle is completely melted without agglomeration. 1537°C, the slag thickness is 56mm, the amount of slag is relatively small, the additional lime is 1.5kg / ton steel, the bauxite is 0.75kg / ton steel, the silicon carbide is 0.4kg / ton steel, and the silicon calcium powder is 0.2kg / ton / ton Steel, calcium carbide is 0.8kg / ton / steel, use the ladle bottom blower to stir the slag evenly, lower the electrode temperature, raise the electrode when the temperature reaches 1560, measure the temperature and take samples to observe the slag condition, add silicon calc...
Embodiment 2
[0039] The steel grade is ∮12mm HRB400, and the process route is: converter—LF refining—billet continuous casting machine. During the tapping process of the converter, bauxite, lime and silicon carbide are used to make refining pre-melted slag, and the lime used is 3.5kg. / ton of steel, bauxite is 2.3kg / ton of steel, silicon carbide is 1kg / ton of steel, the temperature of molten steel after tapping is 1578°C, and the slag in the ladle is completely melted without agglomeration. 1543°C, the slag thickness is 52mm, the amount of slag is too small, add lime 2kg / ton steel, bauxite 1kg / ton steel, silicon carbide 0.5kg / ton steel, silicon calcium powder 0.2kg / ton / steel, Calcium carbide is 0.8kg / ton / steel, use ladle bottom blowing to stir the slag evenly, lower the electrode temperature, raise the electrode when the temperature reaches 1560, measure the temperature and take samples to observe the state of the slag, add silicon calcium powder again at 0.2kg / ton / steel , calcium carbide...
Embodiment 3
[0041] The steel grade is ∮16mm HRB400, and the process route is: converter—LF refining—billet continuous casting machine. During the tapping process of the converter, bauxite, lime and silicon carbide are used to make refining pre-melted slag, and the lime used is 4.1kg. / ton of steel, bauxite is 3.2kg / ton of steel, silicon carbide is 1.5kg / ton of steel, the temperature of molten steel after tapping is 1571°C, the slag in the ladle is completely melted and there is no agglomeration phenomenon, and the LF refining station measures the temperature The temperature is 1529℃, the slag thickness is 81mm, and the amount of slag meets the requirements. Only use silicon-calcium powder at 0.2kg / ton / steel, and calcium carbide at 0.6kg / ton / steel. Use ladle bottom blowing to stir the slag evenly. When the temperature reaches 1560, lift the electrode, measure the temperature and take samples to observe the slag condition, add silicon-calcium powder again at 0.2kg / ton / steel, and calcium car...
PUM
| Property | Measurement | Unit |
|---|---|---|
| particle size | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 