Large-tow asphalt-based carbon fiber and preparation method thereof
A pitch-based carbon fiber and large-tow technology, which is applied in the fields of fiber chemical characteristics, textiles and papermaking, can solve the problem that there is no reasonable and effective method for preparing large-tow pitch-based carbon fibers, and the inability to prepare large-tow pitch-based carbon fibers, Problems such as the inability to prepare large tow raw silk, etc., to achieve the effect of continuous production, improved production efficiency, and smooth operation of the whole line
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
preparation example Construction
[0024] The preparation method of the large tow pitch-based carbon fiber disclosed in the present invention, the basic technological process is:
[0025] Raw silk spinning - winding and winding - constant tension yarn release - air twisting - hot roller drying - non-melting treatment - carbonization treatment - graphitization treatment - untwisting - sizing treatment - drying - winding and winding.
[0026] see figure 1 , in order to realize the equipment block diagram of the above-mentioned technological process, wherein, 1 is a multi-station constant tension spinning machine; 2 and 3 are limit rollers; 4 is a twisting device (including 2 air interlacers); 5 is a heat Roll dryer (three rolls); 6 is a non-melting treatment furnace (chlorination furnace); 7 is a carbonization furnace; 8 is a graphitization furnace; 9 is an untwisting device (including 2 air interlacers); device; 11 is a drying device.
[0027] Taking 1K pitch-based raw silk as an example, the specific process ...
Embodiment 1
[0040] A preparation method of a large tow pitch-based carbon fiber, comprising the following steps:
[0041] 1) Using mesophase pitch as raw material, 1K pitch-based precursor fibers are prepared by melt spinning, with an average fiber diameter of 30 μm and a length of 5000 m;
[0042] 2) Unwinding through a 12-station constant tension unwinding machine (the unwinding tension is 200cN), limiting the width of the fiber through the limit roller (the width is controlled at 20mm), and the running speed of the whole line is controlled at 0.3m / min; use The air interlacer is used for twisting treatment (the number of air interlacers is 2), the compressed air flow is controlled at 0.8L / min, and the number of twists is controlled at 3 pieces / m; the twisted synthetic raw yarn is dried by hot rollers Treatment, the number of drying rollers is 3, the drying temperature is 150°C, 180°C, and 210°C, and the time is controlled at 900s;
[0043] 3) Non-melting treatment through three-roller ro...
Embodiment 2
[0052] A preparation method of a large tow pitch-based carbon fiber, comprising the following steps:
[0053] 1) Using mesophase pitch as raw material, 1K pitch-based precursor fibers are prepared by melt spinning, with an average fiber diameter of 15 μm and a length of 5000 m;
[0054] 2) Unwinding through a 12-station constant tension unwinding machine (the unwinding tension is 100cN), the width of the fiber is limited by the limit roller (the width is controlled at 20mm), and the running speed of the whole line is controlled at 0.3m / min; use The air interlacer is twisted (the number of air interlacers is 2), and the compressed air flow is controlled at 0.7m 3 / h, the number of twists is controlled at 2 / m; the twisted synthetic raw yarn is subjected to hot roller drying treatment, the number of drying rollers is 3, the drying temperature is 150°C, 180°C, and 210°C, and the time is controlled at 540s;
[0055] 3) Non-melting treatment by three-roller roller, starting tempera...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Tensile strength | aaaaa | aaaaa |
| Modulus | aaaaa | aaaaa |
| Bulk density | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 
