Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Tunnel soft rock full-section multi-stage ultra-deep hole double-end plug and stemming plugging high-efficiency blasting method

A full-section, ultra-deep hole technology, applied in tunnels, blasting, mining equipment, etc., can solve the problems of low blasting efficiency, limited blasting footage, waste of process time, etc., to improve the blasting effect, ensure the quality of the initial blasting, seal The effect of improving the plugging quality

Active Publication Date: 2020-04-21
CHINA RAILWAY 18TH BUREAU GRP CO LTD +2
View PDF6 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0019] ① Blast holes are blocked by blasting mud. Because the quality of blasting mud is difficult to guarantee, the blasting efficiency is low, about 70%, resulting in limited blasting footage, and the cycle footage is 3.2-3.5m
Peripheral eye blasting effect is poor, over- and under-excavation is difficult to control, local over-excavation wastes spray anchor material, local under-excavation needs to be repaired, wastes process time, and disturbs the surrounding rock many times, resulting in block drop, high safety risk

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Tunnel soft rock full-section multi-stage ultra-deep hole double-end plug and stemming plugging high-efficiency blasting method
  • Tunnel soft rock full-section multi-stage ultra-deep hole double-end plug and stemming plugging high-efficiency blasting method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0041] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0042] The purpose of the present invention is to provide a kind of high-efficiency blasting method for the plugging of multi-stage ultra-deep hole double-head plugs and mud plugs on the full section of soft rock in tunnels, so as to solve the problems in the prior art, improve the plugging quality and blasting effect, reduce the Blasting vibration can avoid under-excavation and reduce the range of over-excavation to improve construction efficiency and construc...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

PropertyMeasurementUnit
Depthaaaaaaaaaa
Drilling diameteraaaaaaaaaa
Login to View More

Abstract

The invention discloses a tunnel soft rock full-section multi-stage ultra-deep hole double-end plug and stemming plugging high-efficiency blasting method, and relates to the technical field of tunnelblasting. The full-section multi-stage same-depth inverted square-frustum-shaped ultra-deep hole double-end plug and clay stemming high-efficiency blasting method is adopted, wherein a No. 2 rock emulsion explosive is used as an explosive, a non-electric millisecond detonator is used as a detonator, and a detonating network is formed by serial and parallel connection of detonating tubes; a pneumatic rock drill is used for drilling; a blast hole layout diagram is as follows: multiple cutting holes, inner ring holes, peripheral holes and bottom plate holes are arranged; a charging structure is formed in such a way that the cutting holes are continuously charged, the peripheral holes are charged at intervals, the inner ring holes and the bottom plate holes are continuously charged, and the cutting holes, the peripheral holes, the inner ring holes and the bottom plate holes are plugged each through a combined mode of a plug, stemming and a plug; and the blasting footage is 3.9-4.1m, and the surrounding rock is sealed by concrete primary spraying after slag discharge. The method overcomes the defects of poor blasting effect, low blasting efficiency and poor safety in the prior art, andcan improve the blasting effect, the blasting efficiency and the safety.

Description

technical field [0001] The invention relates to the technical field of tunnel blasting, in particular to a high-efficiency blasting method for tunnel soft rock full-section multi-stage ultra-deep hole double-headed plug mud plugging. Background technique [0002] The exit work area of ​​a double-track tunnel of a high-speed railway is designed as grade IV soft rock, and the excavated surrounding rock is revealed to be sandy and carbonaceous shale, with well-developed joints and fissures, well-developed fissure water, beaded leakage, and moderate self-stability. Next, the full-face drilling and blasting method is adopted for construction. [0003] (1) Using IVa2 support parameters: [0004] ① Advance support adopts φ42 small conduits, 4.5m in length, 3.0m in longitudinal spacing, 40 in each ring, and 0.5m in circumferential spacing. [0005] ② The initial support adopts shotcrete, steel mesh, anchor rod and I18 steel. [0006] Shotcrete: C25 concrete, 25cm thick for the ar...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): F42D3/04F42D1/18E21D9/00
CPCF42D3/04F42D1/18E21D9/006
Inventor 张馨刘飞香张春武赵志涛王伟
Owner CHINA RAILWAY 18TH BUREAU GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products