[0054] The present invention is further illustrated below by means of examples, but the present invention is not limited to the scope of the examples. For the experimental methods that do not specify specific conditions in the following examples, select according to conventional methods and conditions, or according to the product instructions.
[0055] The specific parameters of the straight arc slab caster adopted in each of the following embodiments are as follows:
[0056]
[0057]
[0058] The secondary cooling water in the secondary cooling zone in each of the following embodiments adopts the following configuration:
[0059]
[0060]
[0061] The parameter of the mold flux that adopts in following each embodiment is as follows: (weight %)
[0062]
[0063] The relevant parameter of crystallizer in following each embodiment is as follows:
[0064] The water flow rate of the wide surface is 2700L / min, and that of the narrow surface is 500L / min.
[0065] T...
example 1
[0068] In June 2018, the applicant company produced martensitic precipitation-hardened stainless steel slabs (secret experiment) on a straight-arc slab continuous casting machine, producing 1 heat of steel with a slab size of 200×1240×Lmm. The process is as follows:
[0069] ①Molten steel composition
[0070] The actual composition of the molten steel is as follows, which meets the composition requirements of the national standard for steel grades.
[0071] element C Si mn P S Cr Ni Mo Cu Nb Fe actual value 0.042 0.38 0.51 0.016 0.0011 13.82 5.36 1.39 1.37 0.29 remaining
[0072] ②Process temperature and casting speed control
[0073] Tunnel temperature 1 Tunnel temperature 2 Tunnel temperature 3 Tunnel temperature 4 Tunnel temperature 5 pulling speed 1508 1505 1506 1502 1502 0.75
[0074] ③Using special mold slag, the process slag condition is normal, the consumption is 0.52kg / ton of steel, t...
example 2
[0079] The applicant company produced martensitic precipitation-hardening stainless steel slabs (secret experiment) on a straight-arc slab continuous casting machine in April 2019. This time, it produced 2 continuous furnaces, and the slab size was 200×1240×Lmm. The process is as follows:
[0080] ①Molten steel composition
[0081] The actual composition of the two furnaces of molten steel is as follows, which meets the composition requirements of the national standard for steel grades.
[0082] element C Si mn P S Cr Ni Mo Cu Nb Fe Heat 1 0.042 0.38 0.51 0.016 0.0011 13.82 5.36 1.39 1.37 0.29 remaining Heat 2 0.038 0.41 0.53 0.015 0.001 13.76 5.32 1.41 1.36 0.30 remaining
[0083] ②Process temperature and casting speed control
[0084] index Tunnel temperature 1 Tunnel temperature 2 Tunnel temperature 3 Tunnel temperature 4 Tunnel temperature 5 pulling speed Heat 1 1509 1507 1507...