Semi-permeable pavement system and pavement rainwater collection system
A semi-permeable and permeable concrete technology, used in waterway systems, sewer systems, roads, etc., can solve problems such as high construction costs, poor water permeability of permeable pavements, and urban waterlogging.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
preparation example Construction
[0051] In the present invention, the preparation method of the base layer preferably includes: mixing water, fly ash, cement, recycled aggregate and a water reducer, laying it on the surface of the cushion layer to form the base layer on the surface of the cushion layer. In the present invention, the order of adding materials during mixing is preferably: firstly mix the recycled aggregate, fly ash and cement, and then add water and water reducing agent to the resulting mixture in sequence; the mixing method is preferably stirring; The method of laying is preferably as follows: according to the actual road surface width, the formwork is fixed on both sides of the road; the slurry is poured on site; the flat vibrator is selected to vibrate the slurry and the height is controlled within the required range; after the control of the mixture is completed, the Timely maintenance, maintain a certain humidity, should not be too dry or too wet; the curing period is not less than 7 days, ...
Embodiment 1~3
[0085] First mix lime and fly ash to obtain a dry mixture; then mix the dry mixture with ferrochrome slag and water to obtain a slurry; lay the slurry on the surface of the soil foundation to form a pad on the surface of the soil foundation layer; the consumption of the lime, fly ash, ferrochrome slag and water is shown in Table 5; the thickness of the cushion layer is shown in Table 6;
[0086] Mix water, fly ash, cement, ferrochrome slag + granite waste rock (the mass ratio of ferrochrome slag and granite waste rock is 1:1) and water reducer, and lay it on the surface of the cushion layer. Form the base; the consumption of the water, fly ash, cement, ferrochrome slag+granite waste rock (the mass ratio of ferrochrome slag and granite waste rock is 1:1) and water reducer is shown in Table 5; See Table 6 for thickness;
[0087] A geotextile is laid on the surface of the base layer, and then a perforated high-density polyethylene drainage pipe wrapped in a permeable geotextile ...
PUM
Property | Measurement | Unit |
---|---|---|
thickness | aaaaa | aaaaa |
thickness | aaaaa | aaaaa |
thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com