Cement clinker prepared from lead-zinc smelting slag, cement and preparation method thereof
A technology for cement clinker and slag, which is applied in the field of cement manufacturing, can solve the problems of low early strength of Portland cement clinker, etc., and achieve the effects of comprehensive utilization of resources, good comprehensive performance and reduction of coal consumption.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
preparation example Construction
[0044] The preparation method of the cement of the present application comprises the steps:
[0045] 1) Mixing and grinding the raw materials to obtain raw meal, preheating and decomposing the raw meal, then sintering at 1350-1450 ℃, cooling to obtain cement clinker;
[0046] 2) Mix and grind the cement clinker obtained in step 1) with the gypsum admixture to obtain a fine.
[0047] In step 1), it is cooled to a temperature not higher than 100°C. Further preferably, it is not higher than 60°C.
[0048] Step 1) The lead-zinc smelting slag in the raw material is obtained after the lead-zinc ore smelting slag is pretreated, and the pretreatment includes the following steps: after the lead-zinc ore slag and the carbon material are evenly mixed, they are sent to the bottom blowing furnace for processing. After blowing, the liquid slag obtained by blowing is evenly mixed with carbon material and quicklime, and the smelting slag obtained after smelting is the lead-zinc smelting sla...
Embodiment 1
[0053] The cement clinker of the present embodiment utilizing lead-zinc ore smelting slag is made from the following raw materials by weight: 86 parts of limestone, 5 parts of sandstone, 7 parts of coal gangue, and 2 parts of lead-zinc smelting slag. The rate of cement clinker is: KH=0.915.
Embodiment 2
[0055] The cement clinker using lead-zinc ore smelting slag in this embodiment is made from the following raw materials by weight: 86 parts of limestone, 4.7 parts of sandstone, 6.8 parts of coal gangue, and 2.5 parts of lead-zinc smelting slag. The rate of cement clinker is: KH=0.915.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 
